![Thermo Finnigan LCQ Deca XP Plus Hardware Manual Download Page 168](http://html.mh-extra.com/html/thermo-finnigan/lcq-deca-xp-plus/lcq-deca-xp-plus_hardware-manual_1104316168.webp)
Service Maintenance
Replacing the Turbomolecular Pump _____________________________________________
5-62
___________________ LCQ Deca XP Plus Hardware Manual ________________
5.10Replacing the Turbomolecular
Pump
If the turbomolecular pump fails, it must be replaced (P/N 00108-10010). To
replace the turbomolecular pump, remove the pump as described in the topic
Removing the Turbomolecular Pump. Then, install a new pump as
described in the topic Reinstalling the Turbomolecular Pump.
Removing the Turbomolecular Pump
To remove the turbomolecular pump, proceed as follows:
1. Shut down and vent the system as described in the topic Shutting Down
the System Completely in the System Shutdown, Startup, and Reset
chapter.
2. Open the left and right front doors of the MS detector by loosening the
1/4-in. Allen screw on the right front door with an Allen wrench.
(Disconnect any sample tubes between the syringe pump and the API
source before opening the right front door.)
3. Remove the top cover of the MS detector as described in the topic
Removing the Top Cover of the MS Detector on page 5-6.
4. Loosen the hose clamp that secures the vacuum hose to the tee
(P/N 97144-20031). See Figure 5-18. Disconnect the vacuum hose from
the tee.
5. Remove the AT box.
6. Disconnect the power cable from the turbomolecular pump controller.
7. With a 3/16-in. ball driver or Allen wrench, carefully loosen the two Allen
screws that hold the rails and turbomolecular pump to the vacuum
manifold.
8. Pull the turbomolecular pump out on the rails. If necessary, disconnect
one or more of the vacuum hoses at the foreline union by loosening the
clamping rings and then pulling the hoses free from the foreline union.
9. Remove the turbomolecular pump.
Summary of Contents for LCQ Deca XP Plus
Page 1: ...LCQ Deca XP Plus Hardware Manual Revision A 97344 97003 TM ...
Page 46: ......
Page 56: ......
Page 70: ......
Page 114: ...INSERT Figure5_2 ps 11 X 17 Z fold Figure 5 2 Mass analyzer and ion optics ...
Page 172: ......
Page 194: ......
Page 216: ......