![Thermo Finnigan LCQ Deca XP Plus Hardware Manual Download Page 108](http://html.mh-extra.com/html/thermo-finnigan/lcq-deca-xp-plus/lcq-deca-xp-plus_hardware-manual_1104316108.webp)
Service Maintenance
__________________________________________________________________________
5-2
____________________ LCQ Deca XP Plus Hardware Manual ________________
For instructions on maintaining LCs or autosamplers, refer to the manual that
comes with the LC or autosampler.
The topics included in this chapter are as follows:
•
Tools and supplies
•
Frequency of cleaning
•
Cleaning the ion optics and mass analyzer
•
Replacing the electron multiplier
•
Diagnostics
•
Replacing a fuse
•
Replacing PCBs and Assemblies
Note. The keys to success with the procedures in this chapter are:
•
Proceed methodically.
•
Always wear clean, lint-free gloves when handling the components of the
ion optics, mass analyzer, and ion detection system.
•
Always place the components on a clean, lint-free surface.
•
Always cover the opening in the top of the vacuum manifold with a large,
lint-free tissue whenever you remove the top cover plate of the vacuum
manifold.
•
Never overtighten a screw or use excessive force.
•
Never insert a test probe (for example, an oscilloscope probe) into the
sockets of female cable connectors on PCBs.
Summary of Contents for LCQ Deca XP Plus
Page 1: ...LCQ Deca XP Plus Hardware Manual Revision A 97344 97003 TM ...
Page 46: ......
Page 56: ......
Page 70: ......
Page 114: ...INSERT Figure5_2 ps 11 X 17 Z fold Figure 5 2 Mass analyzer and ion optics ...
Page 172: ......
Page 194: ......
Page 216: ......