3
WARNING
This boiler requires regular maintenance and service to operate safely. Follow the instructions contained
in this manual.
Improper installation, adjustment, alteration, service, or maintenance can cause property damage, personal
injury or loss of life. Read and understand the entire manual before attempting installation, start-up,
operation, or service. Installation and service must be performed only by an experienced, skilled installer
or service agency.
This boiler must be properly vented.
This boiler needs fresh air for safe operation and must be installed so there are provisions for adequate
combustion and ventilation air.
The interior of the venting and air intake systems must be inspected and cleaned before the start of the
heating season and should be inspected periodically throughout the heating season for any obstructions.
Clean and unobstructed venting and air intake systems are necessary to allow noxious fumes that could
cause injury or loss of life to vent safely and will contribute toward maintaining the boiler’s efficiency.
This boiler is supplied with safety devices which may cause the boiler to shut down and not re-start
without service - If damage due to frozen pipes is a possibility, the heating system should not be left
unattended in cold weather; or appropriate safeguards and alarms should be installed on the heating
system to prevent damage if the boiler is inoperative.
This boiler contains very hot water under high pressure. Do not unscrew any pipe fittings nor attempt
to disconnect any components of this boiler without positively assuring the water is cool and has no
pressure. Always wear protective clothing and equipment when installing, starting up or servicing this
boiler to prevent scald injuries. Do not rely on the pressure and temperature gauges to determine the
temperature and pressure of the boiler. This boiler contains components which become very hot when
the boiler is operating. Do not touch any components unless they are cool.
Boiler materials of construction, products of combustion and the fuel contain alumina, silica, heavy metals,
carbon monoxide, nitrogen oxides, aldehydes and/or other toxic or harmful substances which can cause
death or serious injury and which are known to the state of California to cause cancer, birth defects and
other reproductive harm. Always use proper safety clothing, respirators and equipment when servicing
or working nearby the appliance.
Failure to follow all instructions in the proper order can cause personal injury or death. Read all instructions,
including all those contained in component manufacturers manuals which are provided with the boiler
before installing, starting up, operating, maintaining or servicing.
Keep boiler area clear and free from combustible materials, gasoline and other flammable vapors or
liquids.
All cover plates, enclosures and guards must be in place at all times.
This product must be installed by a licensed plumber or gas fitter when installed within the Commonwealth
of Massachusetts.
NOTICE
This boiler has a limited warranty, a copy of which is printed on the back of this manual. It is the responsibility
of the installing contractor to see that all controls are correctly installed and are operating properly when the
installation is complete.
Summary of Contents for EVCA SERIES
Page 14: ...14 Figure 4 Typical Vertical Pressurized Venting ...
Page 16: ...16 Figure 6 Vertical Air Intake Piping Figure 5 Horizontal Air Intake Piping ...
Page 19: ...19 Figure 8 Schematic Boiler Piping ...
Page 25: ...25 Figure 9a 208 230 480V 1PH 3PH 60HZ Supply Power Wiring Schematic ...
Page 26: ...26 Figure 9b 120V 1PH 60HZ Supply Power Wiring Schematic ...
Page 27: ...27 Figure 9c Control Wiring Schematic EVCA 750 2000 ...
Page 29: ...29 Figure 9e Control Wiring Schematic EVCA 3000 ...
Page 32: ...32 Figure 10 Modular System Horizontal Air Intake Piping ...
Page 33: ...33 Figure 11 Modular System Vertical Air Intake Piping ...
Page 34: ...34 Figure 12 Modular System Typical One Pipe Water Piping ...
Page 35: ...35 Figure 13 Modular System Typical Primary Secondary Water Piping ...
Page 36: ...36 Figure 14 Modular System Typical Primary Secondary without System Pump ...
Page 37: ...37 Figure 15 Modular System Typical Reverse Return Water Piping ...
Page 38: ...38 Figure 16 Modular System Reverse Return with System Pump Only ...
Page 39: ...39 Figure 17 Modular System Typical Primary Secondary with Reverse Return ...
Page 55: ...55 Figure 18 Cleaning Secondary Heat Exchanger 1 2 ...
Page 56: ...56 This page intentionally left blank ...
Page 58: ...58 Figure 19 Boiler Combustion Chamber ...
Page 60: ...60 Figure 20 Burner Assembly FRONT VIEW TOP VIEW ...
Page 62: ...62 Figure 21a UL FM CSD 1 Main Gas Train Assembly EVCA 750 2000 ...
Page 64: ...64 Figure 21b UL FM CSD 1 Main Gas Train Assembly EVCA 3000 ...
Page 66: ...66 Figure 22a DB B Gas Train 750 Figure 22b DB B Gas Train 1000 2000 ...
Page 68: ...68 Figure 22c DB B w POC Gas Train 750 Figure 22d DB B w POC Gas Train 1000 2000 ...
Page 70: ...70 Figure 22e DB B Gas Train EVCA 3000 Figure 22f DB B w POC Gas Train EVCA 3000 ...
Page 72: ...72 Figure 23 Jacket ...
Page 74: ...74 Figure 24 EVCA 750 1000 and 1500 Secondary Heat Exchanger and Housing ...
Page 78: ...78 Figure 25b EVCA 3000 Secondary Heat Exchanger and Housing ...
Page 80: ...80 Figure 26 Control Panel Assembly ...
Page 82: ...82 Figure 27 Bishop Pilot Assembly ...
Page 97: ...97 NOTES ...
Page 98: ...98 NOTES ...
Page 99: ...99 NOTES ...