10
■
INTEGRAL BLOWER - RIGHT OR LEFT DUCTING
VENTILATION
Cabinet
Floor
Rear Wall
31-1/2"
to
Counter
Top
7-1/4"
13-1/4"
A
A
B
B
Figure16 – Left SideVenting, Integral Blower
(Bracket Position B)
Front
4.
Place blower inlet over plenum outlet ring (Figure
14), temporarily supporting blower with wood blocks.
5.
Place slot end of blower mounting bracket over
rear mounting rod lower nut.
6.
Rotate blower mounting bracket under blower for
support, removing wood blocks as necessary.
7.
Place hole in blower mounting bracket over front
mounting rod and secure tightly with nut provided.
Insure gasket between blower and plenum is
compressed.
1.
Determine blower direction and cutout in cabinet
as shown in Figs. 16 & 17.
Remove the existing 1/4 – 20 screws from either
positions “A” or “B” and discard them.
2. Secure the rear mounting rod in either position "A"
or "B" as determined in Step 1. The rear mounting rod
has preset nuts on each end. Tighten nut against plenum.
3. Secure the front mounting rod in either position
"A" or "B" as determined in Step 1. The front mounting
rod has one preset nut which shall be tightened against
plenum.
Figure 17 – Right Side Venting, Integral
Blower (Bracket Position A)
Floor
Rear Wal
l
Cabinet
14-3/4"
31-1/2"
to
Counter
Top
7"
A
A
B
B
Front
Clearance hole for 6" round duct exit.
Clearance hole for 6" round duct exit.
Mounting
Rod
Mounting
Rod
Summary of Contents for RDDS30V
Page 16: ...16 BLOWER DUCT SIZING...