![THE SHOWER LAB VIEW 22 Manual Download Page 18](http://html1.mh-extra.com/html/the-shower-lab/view-22/view-22_manual_1100495018.webp)
10/2021 V 1.1
VIEW 22
10/17
With masking tape applied, place the
supplied Stay Bar Jig firmly on both
ends of the Stay Bar and mark the 2
holes with a pen.
Drill holes using a
5mm drill bit.
Assemble the Glass Clamp to the Stay
Bar on both sides as shown.
Secure the T Connector to the Inline
Panel as shown.
Secure the Stay Bar to the Return
Panels, ensuring the Glass is fully
inserted into the Clamps.
STAY BAR CONFIGURATION A - SB12
Drill 1 side only
A3
A4
A5
A6