![THE SHOWER LAB VIEW 22 Manual Download Page 11](http://html1.mh-extra.com/html/the-shower-lab/view-22/view-22_manual_1100495011.webp)
10/2021 V 1.1
VIEW 22
03/17
Remove the Wall Profiles and drill holes
with a 6mm high quality drill bit for a
clean and precise hole.
Fully insert the wall plugs.
Take the Wall Profile So� Seals and
push the seal into place on each Wall
Profile to cover the screws.
Ensure the fin is on the inside (wet
side).
Use the Nylon Block to help.
Using purpose built "Glass Li�ers",
posi�on and sit the Return Glass Panels
on to the Underframe Gasket and push
against the Wall Profiles.
Note the orienta�on and posi�on of
the Panels, this can be determined by
any holes or a�ached labels.
Wet Side
Professional Tip
If drilling ceramic tiles, place
masking tape on the tiles before
marking and drill through the
tape to prevent the drill bit from
skidding.
DO NOT use Hammer Action as
this will break the tiles.
Pre drill the No 6 screws in to the Wall
Profile to create the thread for the Top
Cap, then REMOVE screws.
Fix the Wall Profiles to the wall using
the No 8 screws.
(No 8) Profile - Wall
(No 6) Profile - Top Cap
09
10
11
12