background image

25

26

27

28

07/20

Using a 6mm high quality drill bit for a

clean and precise hole, drill the marked

areas and fully insert the wall plugs.

Professional Tip

If drilling ceramic tiles, place 

masking tape on the tiles before 

marking and drill through the 

tape to prevent the drill bit from 

skidding.

DO NOT use Hammer Action as 

this will break the tiles.

Rea�ach the wall channel in its 

previous posi�on, this �me use silicone 

sealant as indicated. Run a bead of 

silicone sealant down the back face to 

create a water �ght seal.

Silicone

Run beads of silicone sealant down the 

inside walls of the channel as shown.

Do not run too larger beads or fill the 

channel with silicone.

It is very important to put a good 

amount of silicone in the corner where 

the wall channels meet the 

underframe. This area needs to be 

properly sealed to prevent any water 

leakage.

VIEW 07

07/2019  V 2.2

Summary of Contents for VIEW 07

Page 1: ...Illustration View 07 H1 Handle Right Hand Open Out VIEW 07 07 2019 V 2 2...

Page 2: ...glass is moved to its final position Ensure that the glass is installed correctly taking care to avoid installing the glass upside down On certain panels an easy clean coating is applied to one side...

Page 3: ...x1 Glass support x2 Square Alignment Jig x1 Each bracket includes 2x Screws and Wall Plugs 90 Glass to wall bracket x2 Glass to wall hinge x2 Each hinge includes 3x Screws and wall plugs 90 Glass to...

Page 4: ...Supplied Parts Glass to glass bubble h seal x1 Underframe x2 Underframe top x1 Wall channel x1 Bottom door seal x1 3mm Spacer 1mm Spacer Glass to wall seal x2 VIEW 07 07 2019 V 2 2...

Page 5: ...Please use this page to find which stay bar your enclosure has been supplied with SB1 With Glass clamp SB7 With Glass clamp and T connector VIEW 07 07 2019 V 2 2...

Page 6: ...elow diagram to reference the list of parts I H Underframe Bottom Underframe Top L K J Wall Channel Glass to Glass Bubble h Seal Glass to Wall Seal M Bottom Door Seal N Stay Bar SB7 shown A B C D F E...

Page 7: ...underframe using the 90 underframe connector provided You will require a PZ1 screw driver for this step Not included Remove the backing strips from the self adhesive tape and x rmly to the tray 1 2 3...

Page 8: ...plugs and x the channel WARNING The glass is heavy and may damage the floor or underframe if handled incorrectly It is advisable to use a suitable non slip protective mat or piece of carpet Never res...

Page 9: ...pacers into the front underframe Begin with 4mm spacers NOTE There must always be a minimum set of 1mm spacers under the glass panels 9 10 11 12 Align the return panel so it bu s up against the front...

Page 10: ...inline panel 04 20 Loosely assemble the 90 glass to glass brackets Evenly ghten the screws un l the gaskets are nipped Tighten all screws to 15 6N DO NOT t the cover plates yet Loosely assemble the t...

Page 11: ...mmended to use masking tape on the les to mark Li the door out and safely put to one side If OUTWARD opening use the template on the last page to locate Hole B Use masking tape on the wall to mark the...

Page 12: ...ve the glass panel To protect the channel nish it is recommended to mark on masking tape Carefully seperate the two panels Leaving the brackets on the panels li the glass out and put to one side Note...

Page 13: ...break the tiles Rea ach the wall channel in its previous posi on this me use silicone sealant as indicated Run a bead of silicone sealant down the back face to create a water ght seal Silicone Run be...

Page 14: ...back into the channels and onto the spacers Ensure there is no gap at the front of the under frame Screw the brackets to the walls Evenly ghten the screws un l the gaskets just nipping the glass Tigh...

Page 15: ...h A ach the Glass to Wall h seal to hinged edge of the door Check the orienta on is correct Leave the seal oversized This will be trimmed later A ach the glass to glass bubble h seal to the inline pan...

Page 16: ...h stay bar con gura on your screen has been supplied with and refer to the relevant instruc ons below You can nd this out at the front of these instruc ons Config A SB1 Page 09 Config B SB7 Page 12 VI...

Page 17: ...and ne le to cut and nish the edge DO NOT discard the o cut A1 A2 Stay Bar Configuration A SB1 Measure the distance from the inside face wet side of the return panel to the wall opposite Ensure this m...

Page 18: ...be Ensure the stay bar is square and level Mark the end loca on on the wall Remove the stay bar A3 A4 A5 A6 Stay Bar Configuration A SB1 Assemble the glass clamp to the stay bar as shown Secure the gl...

Page 19: ...o the wall Professional Tip If drilling ceramic tiles place masking tape on the tiles before marking and drill through the tape to prevent the drill bit from skidding DO NOT use Hammer Action as this...

Page 20: ...ay bar to the return panel ensuring the glass is fully inserted into the clamp B1 B2 Stay Bar Configuration B SB7 Follow steps A1 A4 Secure the T Connector to the inline panel as shown 14 20 VIEW 07 0...

Page 21: ...s for drilling Use masking tape on the les to mark B5 Using a 5mm high quality drill bit for a clean and precise hole drill the marked areas fully insert the wall plugs and x the connector to the wall...

Page 22: ...ccordingly Notch the inside edge on the handle side of the door to allow the so tail of the ver cal seal to touch the glass Measure the distance between the inline panel and the le Mark and cut the un...

Page 23: ...eals A ach the bo om door seal so the de ector n is on the inside Check orienta on below Check the glass to wall seal orienta on and trim a notch to t around the bo om door seal Trim the flaps With a...

Page 24: ...handle should be oriented so that the grub screws are not visible when looking down on the handle IMPORTANT Apply silicone sealant as shown below to where the xed panels meet the underframe on both s...

Page 25: ...nside wet side of the screen This screen is NOT water ght unless this step is followed Check silicone has been applied to all the below outside areas Let enclosure cure for 48 hours 53 Silicone Silico...

Page 26: ...Glass to Wall Hinge Template Please use this template to locate Hole B if your screen opens OUTWARDS from the wall Tear Here Tear Here 40mm 70mm 27mm 15mm Hole B VIEW 07 07 2019 V 2 2...

Reviews: