![The Fire Dept GD3 Installation Manual Download Page 15](http://html1.mh-extra.com/html/the-fire-dept/gd3/gd3_installation-manual_1099697015.webp)
•
Lay large rocks first, in these positions.
•
Lay small rocks next, in these positions.
•
With glass still removed, switch fire on at ‘HIGH’ setting to check how flame looks. The flame will take 10-20 seconds to light fully.
•
IMPORTANT:
the flame effect should look natural and non-uniform, running the entire length of the burner.
•
Common flame effect issues are:
o
Flame touching edge of burner tray.
o
Missing flames along length of burner.
•
Both these issues can be resolved by switching the fire off and slightly repositioning rocks and logs at the problem areas.
•
Repeat this switching on/off and repositioning until a natural and non-uniform flame effect is achieved.
•
Once a natural and non-uniform flame effect is achieved, switch fire to ‘LOW’ setting and ensure the flame effect, although smaller,
still looks good.
•
Switch fire off and carefully replace glass by simply reversing the glass removal process.
•
Switch the fire on and check that flame effect still looks natural and non-uniform.
•
Note:
it is normal for the glass to mist a little when fire is first switched on. This will quickly disappear.
How to lay River Rocks Firebed
21-3-2017 VERSION 4 Page
of
15
20
Summary of Contents for GD3
Page 1: ...GD3...