Gas installation, connection and commissioning must meet the requirements of AS/NZS 5601.1:2013 and be
installed and certified by a suitably qualified person.
•
In order to access the gas supply and testing area, it is necessary to first remove the glass and the burner tray.
•
Note
: glass removal is best carried out by two people.
•
Follow the ‘
Glass removal process’
in page 4
•
Connect 3/8 soft copper pipe to main valve.
•
Leak test all joints.
•
Switch fire on.
•
Test/adjust high first and then the low pressures against rating plate specifications.
•
In the unlikely event that the rating plate is not attached
Do Not
commission the fire and contact The Fire Dept immediately.
•
Switch fire off.
•
Replace the burner tray by following the
‘Burner Tray Installation Process’
in Step 3 of this guide.
•
Switch fire on.
•
Note
: due to lack of firebed and glass, it may be necessary to manually light burners.
•
Switch fire off
•
Lay firebed in accordance with instructions in Step 7 of this guide.
•
Carefully replace glass by simply reversing the glass removal process.
•
Send gas certificate to appropriate person.
Step 6: Connect gas supply and commission