![TGO TGO100 Maintenance Manuallines Download Page 28](http://html.mh-extra.com/html/tgo/tgo100/tgo100_maintenance-manuallines_1099125028.webp)
www.tgogc.com
55
Energy Equipment General System Configuration
This area is to aid with basic fault finding from any piece of energy equipment. The energy system consists
of three main areas. “The Little Green Heart” (LGH) is a sealed unit that converts the gym equipment
energy to a user LED bar graph, and two USB charging ports. This is a stand alone product and is fitted
inside the gym equipment. To attach multiple gym equipments together into an Energy Display Unit (EDU)
then each LGH will need to be connected to a “Big Green Heart” (BGH), the output of which then connects
into the EDU.
EDU General System Configuration
This area is to aid with basic fault finding within the EDU. Each EDU can operate one
local area LED lighting system plus a PIR controlled path lighting system. In addition
each EDU can optionally have invertors fitted to supply mains AC electrical energy back
into the main grid.
www.tgogc.com
1
3
4
Operate the equipment
as intended to generate
electricity from the
electric generator.
The electricity goes into
the LGH once a minimum
of 24 volts has been
generated. An Internal
green LED will flash.
The electricity then goes
to both the local USB or
LED Bar Graph
Electricity also goes
across to the BGH inside
the EDU.
2
1
3
4
The electricity comes
into the EDU via the BGH.
The electricity
generated will display
on the EDU Performance
Bar display.
Accumulative electricity
generated will display
on the KWh Display.
Electricity will be stored
in two 12v batteries
wired in series to
produce 24v
Where connected
electricity will go out to
a Local lighting system
or via invertors to the
main grid.
2
3
2
1
2
3
4
5