BHT-412-MM-2
5-00-00
7 NOV 2016
Rev. 25
Page 57
Export Classification C, ECCN EAR99
SCHEDULED INSPECTIONS
5-9.
25 HOUR/30 DAY INSPECTION — PART B
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: _________________
_________________________
HELICOPTER S/N: __________
_________________________
REGISTRY NO.: ____________
_________________________
TOTAL TIME:_______________________________________
SIGNATURE: _______________
_________________________
NOTE
For helicopters on the Part B inspection program,
accomplish the following checks each 25 hours of
flight operation or 30 days, whichever occurs first.
GENERAL
1.
Each listed inspection item or maintenance function is to
be performed in accordance with the BHT-412-MM chapter
specified or the BHT-412-CR&O.
2.
Refer to the applicable Pratt & Whitney Canada Engine
Maintenance Manual for engine inspection requirements.
PRELIMINARY REQUIREMENTS
Corrosion Control
Guide,
CSSD-PSE-87-001.
1.
Use medium helicopter corrosion control guide to
establish helicopter corrosion control program.
Chapter 4
2.
Replace all finite life components that have completed
published operating limitations.
Chapter 5
3.
Overhaul all components that have completed published
overhaul periods.
Chapter 12
4.
Lubricate and service helicopter as required.
Summary of Contents for Bell 412
Page 6: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 152: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 160: ......
Page 164: ......
Page 166: ......
Page 168: ......
Page 172: ......
Page 174: ......
Page 198: ......
Page 202: ......
Page 220: ......
Page 224: ......
Page 232: ......
Page 234: ......
Page 236: ......
Page 242: ......
Page 256: ......
Page 262: ......
Page 268: ......
Page 288: ......