BHT-412-MM-2
5-00-00
Page 46
Rev. 25
7 NOV 2016
Export Classification C, ECCN EAR99
Every third 100 hour inspection (300 hours) or 12 months:
1.
Inspect engine fuel and power controls:
a.
Engine control linkages for looseness, lost motion,
chafing, damage, and security of attachment.
b.
Bellcranks, mounts, and jackshafts for looseness,
damage, and security of attachment.
Every sixth 100 hour inspection (600 hours) or 12 months:
NOTE
Maximum N
G
topping check is not applicable to Pratt
& Whitney PT6T-9 engine.
Pratt & Whitney
Canada PT6T-3
Series Maintenance
Manual
1.
Perform maximum N
G
topping check.
Chapter 96
ELECTRICAL SYSTEM
1.
Check inverters for security of mounting and connections.
2.
Check generator control units for damage and security of
mounting and terminals.
3.
Inspect all exposed wire bundles, bundle supports, and
connectors for damage, corrosion, and security. Pay particular
attention to engine deck connectors and harnesses.
4.
Inspect relays and main bus area for security of mounting
and connections.
5.
Inspect bus insulation for damage and condition.
Chapter 95
INSTRUMENT SYSTEMS
NOTE
Following checks are required every 12 months only.
SCHEDULED INSPECTIONS
5-6.
100 HOUR/12 MONTH INSPECTION — PART A (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Summary of Contents for Bell 412
Page 6: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 152: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 160: ......
Page 164: ......
Page 166: ......
Page 168: ......
Page 172: ......
Page 174: ......
Page 198: ......
Page 202: ......
Page 220: ......
Page 224: ......
Page 232: ......
Page 234: ......
Page 236: ......
Page 242: ......
Page 256: ......
Page 262: ......
Page 268: ......
Page 288: ......