BHT-412-MM-2
5-00-00
Page 28
Rev. 16
26 FEB 2013
Export Classification C, ECCN EAR99
Paragraph 5-44
8.
Overhaul all components that have completed published
overhaul periods.
Chapter 12
9.
Perform lubrication requirements.
10.
Remove all panels, fairings, and cowlings required to
satisfactorily carry out the inspection.
NOTE
The following step is to be performed every
12 calendar months.
11.
Inspect all fuel system, oil system, and hydraulic system
filler caps for proper functioning and sealing. Make sure the
sealing O-rings within the filler caps are in good condition.
Repair or replace the filler caps or replace sealing O-rings as
required.
AFTER COMPLETION OF INSPECTION
1.
Reinstall all panels, fairings, and cowlings removed during
inspection.
2.
Carry out a ground run and leak check prior to releasing
the helicopter back to service.
Chapter 21
HEAT/VENT AIR DUCTS
1.
Visually inspect all heating, ventilation, cooling ducts, and
controls for cracks, security, and for proper operation.
Every sixth 100 hour inspection (600 hours) or 12 months:
Chapter 96
1.
Bleed air heating and ventilation/defog system
components:
a.
Perform operational check of bleed air heating system
and components.
b.
Perform operational check of defog blower.
SCHEDULED INSPECTIONS
5-6.
100 HOUR/12 MONTH INSPECTION — PART A (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Summary of Contents for Bell 412
Page 6: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 152: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 160: ......
Page 164: ......
Page 166: ......
Page 168: ......
Page 172: ......
Page 174: ......
Page 198: ......
Page 202: ......
Page 220: ......
Page 224: ......
Page 232: ......
Page 234: ......
Page 236: ......
Page 242: ......
Page 256: ......
Page 262: ......
Page 268: ......
Page 288: ......