BHT-412-MM-2
5-00-00
Page 52
Rev. 23
15 DEC 2015
Export Classification C, ECCN EAR99
b.
Electrical and avionics equipment from the nose area,
as required, to allow a full visual inspection of the nose area to
be done.
c.
Main rotor transmission.
d.
Intermediate gearbox.
e.
Tail rotor gearbox.
f.
Deleted
g.
Tailboom (to allow a full inspection of the aft fuselage
bulkhead and forward tailboom bulkhead).
h.
Landing gear assembly (to allow a complete inspection
of the landing gear attachment points and support structure).
4.
In addition to the 5000 Hour/5 Year Inspection — Part A
items, carry out the following:
a.
Complete Daily Inspection — Part A.
b.
Complete 100 Hour/12 Month Inspection — Part A.
c.
Complete 1000 Hour Inspection — Part A.
AFTER COMPLETION OF INSPECTION
1.
Install the following items:
a.
Main battery.
b.
Electrical and avionics equipment on the nose area.
c.
Main rotor transmission.
d.
Intermediate gearbox.
e.
Tail rotor gearbox.
f.
Deleted
SCHEDULED INSPECTIONS
5-8.
5000 HOUR/5 YEAR INSPECTION — PART A (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Summary of Contents for Bell 412
Page 6: ......
Page 12: ......
Page 32: ......
Page 40: ......
Page 152: ......
Page 154: ......
Page 156: ......
Page 158: ......
Page 160: ......
Page 164: ......
Page 166: ......
Page 168: ......
Page 172: ......
Page 174: ......
Page 198: ......
Page 202: ......
Page 220: ......
Page 224: ......
Page 232: ......
Page 234: ......
Page 236: ......
Page 242: ......
Page 256: ......
Page 262: ......
Page 268: ......
Page 288: ......