DIN806BG
7-3
Tetra Pak
Hoyer
7.3 Tightening roller drive chain
Periodically check the tension of the roller drive
chain; proceed as follows:
1- Unscrew the lock nut (Pos. 1, Fig. 7.1) and
adjust the tension screw (Pos. 2, Fig. 7.1) to
obtain the correct tension for operation;
2- Tighten the lock nut (Pos. 1, Fig. 7.1).
Fig.7.1
•
Wash the pick-up machine and the chocolate
tank thoroughly at the end of production; refer
to point 7.1 – CLEANING AND WASHING,
points a, b, c, d, and e;
7.2.2 Every day
•
Lubricate seals;
material required:
Vaseline oil
•
Wash the pick-up machine and the chocolate
tank thoroughly at the end of production; refer
to point 7.1 – CLEANING AND WASHING,
points a, b, c, d, and e;
•
Check the water level in the space surrounding
the tank.
7.2.3 Every week
•
Lubricate seals, then, when the various
components are dry, lubricate them with neutral
Vaseline before reassembling them.
material required:
Vaseline oil
•
Wash and dry all components, lubricating them
(especially seals) with Vaseline oil before
reassembling them.
7.2.4 At the end of the season
material required:
Vaseline oil
2
1
RETURN TO PM