CommIssIonIng
39
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.A.01 Last revised
07/2020
Procedure
1
Connect the DC connecting cables
5.1
/
5.2
or
7.1
/
7.2
to the
“CHARGER” connections
12
/
13
on the APU . The colours of the
plugs must match the colours of the sockets on the APU, i.e. red
plug to red socket and black plug to black socket.
The plugs must audibly snap into place.
2
Check the cabling for the SMA STPS 60 and the TS HV 70 Outdoor (see installation manual
SMA STPS 60). Inspect the component wiring in accordance with section “5.9 Wiring the battery mod-
ules” on page 22 et. seq. If the wiring is correct, all live components will be protected against physi-
cal contact. Switch the DC power switch on the BatBreaker (if present) to “ON”. Ensure that the
SMA STPS 60’s DC load-disconnecting switch is set to “ON”.
3
Make the settings for terminating and addressing the
TS HV 70 Outdoor “TERM”
5
and “ADDRESS”
10
in accordance
with section “10.2 Expanding capacity using additional TS HV 70
Outdoor units” on page 46 et. seq. In the case of master/slave
systems, “TERM”
5
on the APUs of the master and the last stor-
age system is to be set to “ON”. “TERM”
5
is to be set to “OFF”
for all other slave APUs in the arrangement.
ATTENTION! Possible damage to the APU due to incorrect operation.
If you tap on the APU to activate it or confirm an action, note the following instructions to avoid damag-
ing the APU:
1.
Do not use objects to tap the unit under any circumstances.
2.
Tap gently with your fingers on the marking to the right of the display on the casing.
Never tap on
the display
.
4
Insert the back-up fuse for the TS HV 70 Outdoor in the outdoor distribution enclosure. All the back-up
fuses for the individual TS HV 70 Outdoor cabinets must be inserted so that the distributor panel in
every cabinet has a power supply and the consumers such as the air conditioners and heating units
can be commissioned.
5
In the connector panel, insert the 35 A NH00 fuses
9
or
37
(see
“5.8 Connector panel” on page 19 et. seq.) for the consumer
line in the right fuse holder. To do this, open the fuse holder and
push the fuses into the relevant slot parallel to the holder. Then
close the fuse holder.
6
Switch on the following circuit breakers
33
in the connector panel
D
in sequence:
1. F3 –> 2. F4 –> if necessary 3. F5 –> 4. F7. Information on assigning the circuit breakers can be found in
section “5.8 Connector panel” on page 19 et. seq.
TERM
ON
OFF
ADRESS
BATTERY
CHARGER
ADDRESS
STOP