battery storage system ts hV 70 outdoor
15
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.A.01 Last revised
07/2020
5.3 CABINET SCOPE OF DELIVERY
ITEM
NUMBER
DESCRIPTION
Mast
er
admin
Mast
er
Slav
e
A
1
1
1
TS HV 70 Outdoor Cabinet
B
1
1
1
APU HV1000-S
(pre-installed)
C
3
3
3
Cable retention rails
(pre-installed)
D
1
1
1
Connector panel
(pre-installed, master 9 row, slave 5 row)
E
1
0 | 1
*
–
24 V voltage supply
(pre-installed)
F
1 | 2
1 | 2
1 | 2
Air conditioner
with ventilation plate
(medium | premium)
G
1
1
1
Heating unit
(pre-installed; second heating unit available as an option)
H
1
1
1
Potential equalization rails
(pre-installed, different position on the slave unit in the centre of
the cabinet)
I
1
1
–
Cover for SMA STPS 60
(pre-installed, master designs only)
J
1
1
–
Fastening plate SMA STPS 60
(pre-installed, master designs only)
K
100
100
100
Cage nut
M6 (pre-installed)
K.1
1
1
1
L
auxiliary tool for cage nut
L
100
100
100
M 6 x 16 flat head screws
(cross-head)
L.1
100
100
100
M6 plastic washer
M
4
4
4
M12 x 20 safety screw with rubber washer and seal
(replacement for crane lugs, with anti-theft protection)
M.1
1
1
1
L
socket for M12 safety screw
N
1
1
1
Special hexagon socket screwdriver
(for fixing screws on the base cover)
O
2
1*
–
Switch
(pre-installed, master designs only)
P
1
–
–
SMA Inverter Manager
(pre-installed, master designs only)
Q
1
–
–
SMA Data Manager M
(pre-installed, optional, master designs only)
R
1
1
1
Concrete base
(optional)
S
3
3
3
Battery cabinet security key
T
2
2
0
Inverter cover key
(master designs only)
*
Only for systems with an interconnection of 4 masters, the fourth master has a 24 V voltage supply and an additional switch