38
CommIssIonIng
© TESVOLT We reserve the right to make technical changes! RD.TI.026.E.ENG_Installation_Manual_TSHV70OD_v.A.01 Last revised
07/2020
14
The 125 A NH00 fuses
9.1
or
37
(see “5.8 Connector panel” on
page 19 et. seq.) for the battery inverter can now be inserted in
the left fuse holder. To do this, open the left fuse holder and push
the fuses into the relevant slot parallel to the holder. Then close
the fuse holder.
15
Once the NH00 fuses have been inserted, wait until the SMA STPS 60 has completely started up.
16
The commissioning process for the SMA STPS 60 must then be
started using the SMA LCS Tool. The software and a manual can
be found on the USB drive
11
.
Once the commissioning process
has been successfully completed, the TS HV 70 Outdoor switches
to pre-charge mode “PRECH”.
17
After pre-charge mode, the switch lights up permanently. “OK”
appears as the Status item on the display. The TS HV 70 Outdoor
is now ready for operation.
Note:
The display remains active for approximately two minutes and is then deactivated. It can be
reactivated by tapping twice.
18
Close the connector panel on the STPS. Then refit the cover
I
and lock using the key
T
.
8.2 COMMISSIONING TS HV 70 OUTDOOR SYSTEMS USING THE MASTER/SLAVE PRINCIPLE
ATTENTION! Possible damage to the battery due to incorrect configuration.
Incorrect configuration can cause damage to the battery. The parameter settings influence the
SMA STPS 60’s charging behaviour. For this reason, it is important to make the correct settings during
commissioning.
Prerequisites
The SMA STPS 60 SMA STPS 60 has been installed in accordance with SMA’s specifications (installa-
tion/connection).
STOP