background image

 [EN]  English - 

9

K345 Issue 4

Operation - UPM Pressure measurements

Read all the instructions supplied with the UPM and then 
use the specified procedures to connect it (Figure 7/8). 

Figure 7: 

Example configuration - Pressure measurement 

with a UPM

When the connections are complete, make the necessary 
IDOS selections (Table 2/3). 
If you re-attach a UPM, the instrument uses the same 
measurement units that you used before. The instrument 
keeps a record for the last 10 modules.

UPM - Measure the pressure

To measure the pressure (Figure 7): 
1. Select the applicable pressure task from 

Select Task

 

(Table 2/3) and, if necessary, adjust the 

Set Up

 (Table 1)

and the 

Settings

 (Table 4/5).

2. If necessary, do a zero correction (Table 4).
To measure pressure with another operation (Figure 8), use 
the same procedure.

 

Figure 8: 

Example configuration - To measure pressure 

and temperature

UPM - Leak test

To do a leak test on a pressure system (Figure 7):
1. Select an applicable leak test from 

Select Task

 

(Table 2/3) and, if necessary, adjust the 

Set Up

 (Table 1)

and the 

Settings

 (Table 4).

2. Set the period for the leak test (Table 4).
3. If necessary, do a zero correction (Table 4).
4. To start the leak test, select Start (

 

). When the test is 

finished, the instrument calculates the leak rate in the 
applicable units/minute.

Operation - Error indications

If the display shows <<<< or >>>> : 
• Make sure that the range is correct.
• Make sure that all the related equipment and 

connections are serviceable.

Settings

a) Pressure

b) Leak test

Start

Settings

Settings

Summary of Contents for Druck DPI 811

Page 1: ...Druck DPI 811 812 RTD calibrator and RTD loop calibrator User manual K345 99 Washington Street Melrose MA 02176 Phone 781 665 1400 Toll Free 1 800 517 8431 Visit us at www TestEquipmentDepot com...

Page 2: ...K345 Issue 4 A1 A2 DPI 812 A3 10 1 3 4 2 5 6 7 9 8 A2 A3 11 B1 12 10 14 15 13 20 21 22 25 17 18 26 19 27 16 23 24 B1 Customer service Visit our web site www gesensing com...

Page 3: ...s uses Intelligent Digital Output Sensor IDOS technology to give instant plug and play functionality with a range of Universal Measurement Modules UMM Example the Universal Pressure Module UPM The DPI...

Page 4: ...ion above it on the display Item 25 Example Settings 8 Display Refer to A3 9 SENSOR PC Communications port Use to connect a Universal Measurement Module UMM or a RS232 cable 10 RTD connectors To measu...

Page 5: ...se this instrument together with a HART communicator to set up and calibrate HART devices Scale To select the applicable international temperature scale IPTS 68 or ITS 90 To select and set up the back...

Page 6: ...select and set up a tare value for the measurement task a specified value or the reading on the display The instrument subtracts a positive tare value and adds a negative tare value Additional data S...

Page 7: ...ional Additional data Table 6 Select Settings Step To select and set up values for the Defined Step output Example output cycle Auto Repeat Optional Additional data Table 6 Select Settings Options If...

Page 8: ...adjust the Set Up Table 1 2 Select the RTD or Ohms input task from Select Task Table 2 3 and if necessary adjust the Settings Table 4 Figure 1 Example configuration To measure the temperature or resis...

Page 9: ...ransmitter calibration DPI 812 only To calibrate a transmitter 1 Connect the instrument Figure 3 4 and if necessary adjust the Set Up Table 1 2 Select the applicable calibration task from Select Task...

Page 10: ...the top right hand corner 3 Supply the output values to the system Table 7 Example Nudge output a Use Edit to set a value less than the switch value b Use the buttons to change the value in small incr...

Page 11: ...Settings Table 4 5 2 If necessary do a zero correction Table 4 To measure pressure with another operation Figure 8 use the same procedure Figure 8 Example configuration To measure pressure and temper...

Page 12: ...set the new calibration date for the instrument Calibration Procedures Ohms input 1 Let the equipment get to a stable temperature minimum 5 minutes since the last power on 2 Use the calibration menu...

Page 13: ...nt get to a stable temperature minimum 5 minutes since the last power on 3 Use the calibration menu Table 9 to do a three point calibration FS Zero and FS The display shows the applicable instructions...

Page 14: ...850 0 90 0 50 Pt100 385 IEC 751 328 1562 200 850 0 45 0 25 Pt200 385 IEC 751 328 1562 200 850 1 08 0 60 Pt500 385 IEC 751 328 1562 200 850 0 72 0 40 Pt1000 385 IEC 751 328 752 200 400 0 36 0 20 D 100...