7
NEOLINE
PRO
�
1/1
�
1-3 kVA
�
ONLINE UPS
USER MANUAL
7
⚫
Connect the UPS with the power outlet which is over-current protected. Do not
connect the UPS with power outlets whose rated current is less than the maximum
input current of this UPS.
⚫
All power outlets should be configured with earthing device for safety.
⚫
UPS could be electrified or powered no matter the input power cord is tied or not,
even when the UPS is off.The only way to cut off the output is switching off the UPS
and disconnecting the mains power supply.
⚫
For all standard model UPS, it is advised to charge the batteries over 8 hours before
using. Once the AC mains power energizes the UPS, it will automatically charge the
batteries. Without prior charging, UPS output remains as usual but with shorter
back-up time than normal.
⚫
When connected to motor, display equipment, laser printer etc., UPS power
selection should be based on the startup power of the load which is usually twice
as rated power.
⚫
Wiring by a qualified electrician is required. Ensure input cables and output cables
are connected correctly and firmly.
⚫
If install a leakage current protective switch, please install it on output cable.
3.3 Installation and output connection
Normally, output connection of 1~3kVA series is configured with power outlets or
terminal blocks, users can plug the load cable into the UPS power outlets to energize
the load. Make sure the mains cable and breakers in the building are enough for the
rated capacity of UPS to avoid the hazards of electric shock or fire.
3.4 Standard Model Built-in Battery Pack Installation
Guide
Step 1 Make sure the UPS is in mains mode, remove the two plastic panels on the
front.