OVERHAUL PROCEDURE
3-1
Page 1
ML50-20 MAINTENANCE LIFT
TESCO EQUIPMENT LLC
CHAPTER 3: OVERHAUL
Section 1: Overhaul Procedure
1.
GENERAL INFORMATION
If an overhaul of a component is needed (or required), refer to Chapter 5, Manufacturer’s Data for
pertinent information. The section that covers the component should be read in full and understood
completely before attempting an overhaul.
Units operating in extreme conditions (such as high or low temperatures, long periods of sustained
operation, continued operation in sand or dust, or continued exposure to sea air or moisture) need
regular inspection. Overhaul periods can vary.
For adjustment or repair of components, refer to Chapter 2.
Apr. 06
Property of American Airlines
Summary of Contents for ML50-20
Page 5: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 13: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 19: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 27: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 41: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 43: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...