MAINTENANCE
2-5
Page 12
TESCO EQUIPMENT LLC
ML50-20 MAINTENANCE LIFT
Figure 9
ELECTRICAL SCHEMATIC - SHEET 7 OF 7
GRD
ETM-68A
PTO
RPM1
12V
InPower Throttle
CANL
IP
CANH
30
TIME DELAY
VCM-03.10SA
87A
86
85
MB
10
+120VAC
GROUND POWER
A1
GROUND POWER
CONNECTED
A2
CR20
GP
120VAC WHEN
GROUND
GROUND
POWER
221
200
106 -
105 -
103 -
104 -
4
DLC Cable
CC1-D
IGNITION SWITCH
CC1-B
HI THROTTLE
CONTROL
MODULE
ENGINE
253 -
252 -
GC-1
ENABLE
[LOWER]
SW13
GC
GC-2
SOL2
PTO
EN
PTO
-12V
200 -
201 -
121 -
122 -
123 -
- 12V
-12V
IGN
+12V
87
(HIGH THROTTLE)
254
CR10
227
30
E
4
LIFT
28
106
P
S10
- 12V
S11
LIFT
MODE
LIFT
MAIN BOX
OIL OVERHEAT
87a
30
CR21
300
30
CR4
87A
30
CR5
87A
B ENGINE STOP
[OPT.]
(NEUTRAL)
CR8
(STAB STOWED)
(BODY DOWN)
118
205
215
113
36
123
(GROUND POWER)
14
CR20
13
87A
30
CR8
(BODY DOWN)
215
MAIN BOX
MAIN BOX
ECM
253 P
EN
CHASSIS
CHASSIS
CHASSIS
BLACK
RED
GRN
YEL
RED
OPTION FOR GAS ENGINE THROTTLE RAMP UP W/ TIME DELAY
OPTIONS
OPTION FOR GROUND / SHORE POWER
7.2A
3.0A
Jan. 14
Property of American Airlines
Summary of Contents for ML50-20
Page 5: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 13: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 19: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 27: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 41: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...
Page 43: ...THIS PAGE INTENTIONALLY LEFT BLANK P r o p e r t y o f A m e r i c a n A i r l i n e s ...