Quick-Start Operating Guide
USP 797 Modular Cleanroom
©
Copyright 2015 Terra Universal Inc. All rights reserved. • Revised Dec 2019 • Document No. 1800-90
Terra Universal, Inc. • TerraUniversal.com • 800 S. Raymond Ave. • Fullerton, CA 92831 • TEL: (714) 578-6000 • FAX: (714) 578-6020
9
Component List (included)
This list includes the basic cleanroom components and may not be complete. Quantities vary based on the
specifications of each particular unit:
NOTE:
Refer to “Hardware Sheet” and “Crate Pages” included with your delivery for complete information specific to
your order.
Room structure:
Upright Frame Supports
Horizontal Frame Members
Long and Short Ceiling “T” Joists numbered to facilitate installation (see system drawings)
SS Window Frames (interior and exterior)
0.25” thick x 46”W x 36”H tempered glass window
Polypropylene Air Exhaust Vents
2’ x 4’ Polypropylene Ceiling Panels
FRP Side Panels (Fiberglass Reinforced Plastic): (12) 4’ x 8’ sheets (includes one extra)
Advanced Polymer FRP Adhesive
Sealant for FRP Seams
Powder-coated Steel Trim Strips (top horizontal)
Operation Status Indicators (4), installed in top trim corner pieces
U-brackets (provide mounting support for dry wall installation)
.25” and .125” plastic spacers (for mounting FRP panels)
Outlet template (guide for FRP cut-out to accommodate duplex outlet)
Yellow warning stickers, instructing personnel not to stand or walk on cleanroom ceiling
Hardware:
See list on following two pages
Tubing/Cords:
Polyethylene tubing
Yellow cord (with 3- and 4 pin-connections) to connect blowers and lights
Mini Yellow cord (with 4- and 5-pin connections) to connect control panel and Power Distribution Module (PDM)
White telephone cable for Status Indicator Lights
Warning Labels to attach to Ceiling Trim
Electrical:
Electrical Service Equipment, including
-
One (1) master light toggle switch, mounted on control panel
-
One (1) master blower switch (ON/OFF pushbuttons), mounted on control panel
-
Power Distribution Module (controls up to 5 lights and 4 Fan Filter Units)
-
115 or 230 VAC yellow power cables (for connection to FFUs and lights).
-
Duplex Power Outlet, installed on upright frame support in Buffer Room
-
Operation Status Indicators: mounted on each exterior corner