Installation Notes:
Plan on following this order of assembly for successful installation of the USP 797 Modular Cleanroom. Instructions in
this manual present each section in this order:
1)
Frame, Ceiling and Control Panel
5) Air Exhaust vents, Control Panel
2)
Power Distribution Module
6) Viewing Window
3)
FFUs, lights, and ceiling panels
7) FRP Application to Wallboard
4)
Wallboard
8) Access Doors
9) Top Trim
Review all of the steps and drawings below before beginning installation.
IMPORTANT SAFETY NOTICES
1) Terra Universal Cleanrooms are not designed to support more weight than the blower modules and
lighting fixtures originally installed. In particular, the ceiling grid beams are not load bearing and will not
support personnel or other additional loads. Placing added weight on the ceiling grid may result in serious
damage to the room and occupants. The yellow safety notice supplied by Terra Universal must be affixed to
the cleanroom grid.
2) Fiberglass is a known irritant. Personnel working with FRP sheets should wear protective coveralls, eye
protection, and respirators when cutting FRP sheets, as required by local safety code.