CLEANING AND MAINTENANCE
29
Fully close the shaft valve.
Tighten the knurled screw in front of the fan in order to prevent air from passing through
the fan flaps.
Turn on the by-pass line valve, if there is.
Do not open the lid covers of the boiler.
Do not drain the water in the boiler.
Make sure the valves are closed.
After the power is back on, do not forget to set the boiler to its previous condition.
If possible, use uninterrupted power supply (Ups) to prevent the circulation pump from
stopping operation in case of power outages.
In order to obtain efficient burning from the boiler and allow the boiler operate efficiently,
the ashes accumulated on the sieves should be periodically let down by means of moving the
ashes with the help of sieve discharge lever before adding fuel to the boiler for prismatic
boilers.
When the flames become glowing in the cylindrical boilers, the fuel should be added to the
boiler after the ashes among the glows are let down with the help of fire rake. This way, the
ashes preventing the burning air shall be removed from the sieve.
For a more efficient burning, regularly clean the ash sieve. Also;
Check the water level in the boiler before each operation.
The boiler should be operated as per the burning instructions and the flame in the burning
chamber should be controlled and full burning should be provided.
Smoke pipes, the turbulators inside the smoke pipes and the smoke box where the boiler
is connected to the shaft should be cleaned at least once a week.
Clean the shaft at least 3 times in a season.
Clean the ashes accumulating in the shaft daily. You may want to perform the cleaning
two times a day depending on the quality of the coal used (ash rate).
Make sure that dust and burning coals do not fall onto the electrical equipments of the
boiler and the fan.
Do not clean the boiler when it is operating.
You are recommended to get your boiler maintained and controlled (paid) by the
TERMODÝNAMÝK
AUTHORIZED SERVICE before the winter.
H E A T I N G S Y S T E M S
Summary of Contents for EKY 100
Page 4: ...EKY 17 100 TECHNICAL SPECIFICATIONS 1 H E A T I N G S Y S T E M S D C G F E EKY 17 SIDE VIEW ...
Page 6: ...EKY 125 250 TECHNICAL SPECIFICATIONS 3 H E A T I N G S Y S T E M S 338 mm 365 mm ...
Page 8: ...EKY 125 500 3 BAR TECHNICAL SPECIFICATIONS 5 H E A T I N G S Y S T E M S ...
Page 10: ...EKY 125 1000 5 BAR TECHNICAL SPECIFICATIONS CHART 7 H E A T I N G S Y S T E M S ...
Page 35: ......
Page 36: ...H E A T I N G S Y S T E M S ...