![Termodinamik EKY 100 Installation And Usage Manual Download Page 12](http://html.mh-extra.com/html/termodinamik/eky-100/eky-100_installation-and-usage-manual_1089223012.webp)
APPLIANCE INFORMATION
ASSEMBLY INSTRUCTIONS
EKY series boilers are designed to burn different types of fuels such as wood, walnut coal, quince
coal and low-calorie brown coal in ranging capacities. As it is known, the shaft gasses which
occur as a result of burning wood and coal, and condensation of water vapors shall take place.
Make sure not to operate the boiler below 45°C. In case of operation below 45°C, the temperature
of the shaft will be low and this will cause the shaft draft to be insufficient and result in
condensation. Therefore, the life span of the boiler shall be shorter due to corrosion in short time.
The circulation pump in EKY Model boilers stops operating when the boiler water temperature
decreases below 32°C. This is designed to prevent the substantial decrease in the boiler output
water temperature and acid drop (sulfuric acid) resulting from condensation by means of cooling
the firebox.
The fan allowing for burning air stops operating when the boiler water temperature falls under
28°C and the “fuel out” light on the panel indicator is on. This is designed to prevent the fan from
cooling more the shaft gasses in case the boiler fuel decreases. When the shaft gas cools down,
condensation occurs in the shaft. Such condensed water contains acid.
9
The boiler should be leveled and installed at least at a distance of 20 cm from ground in boiler
rooms on a durable surface.
The boiler room should be regularly ventilated according to regulations and rule.
When assembling EKY series boilers, it is required to use open expansion tank. The expansion
tank should be located at the top of the installation and the safety pipes should be connected to the
inputs and outputs of the boiler in the shortest route possible. There should never be any flow
control units (valve, check valve, etc.) over the safety pipes. Make sure that the open expansion
tank is always full. The expansion tank volumes suitable for each boiler are given in the table (at
the page 11).
The pump should be installed in such way to avoid boiler and expansion tank flow and return
pipes should not create an air pocket. On points where there is possibility for air to be
accumulated, air tubes or vent systems shall be provided to purge the air.
H E A T I N G S Y S T E M S
CORRECT
WRONG
CORRECT
WRONG
Summary of Contents for EKY 100
Page 4: ...EKY 17 100 TECHNICAL SPECIFICATIONS 1 H E A T I N G S Y S T E M S D C G F E EKY 17 SIDE VIEW ...
Page 6: ...EKY 125 250 TECHNICAL SPECIFICATIONS 3 H E A T I N G S Y S T E M S 338 mm 365 mm ...
Page 8: ...EKY 125 500 3 BAR TECHNICAL SPECIFICATIONS 5 H E A T I N G S Y S T E M S ...
Page 10: ...EKY 125 1000 5 BAR TECHNICAL SPECIFICATIONS CHART 7 H E A T I N G S Y S T E M S ...
Page 35: ......
Page 36: ...H E A T I N G S Y S T E M S ...