3-12
GTH-1256 AF
Part No. 57.4400.9219
September 2017
Section 3 • Scheduled Maintenance Procedures
CHECKLIST A PROCEDURES
A-11
Perform Gear Box Maintenance
Note: Axle speci
fi
cations require that this
procedure be performed after 100 hours.
Lubricating oil - change
Sensor reading zone - clean
Required maintenance procedures and additional
axle information are available in the
Dana 367 Gear Box Service Manual
(Dana part number GSM-0016).
Dana 367 Gear Box Service Manual
Genie part number
57.4700.0027
A-12
Perform Axle Maintenance
Note: Axle speci
fi
cations require that this
procedure be performed weekly.
NOTICE
In case of sever duty, the
following procedures must be
carried out every day.
King pin tapered bearings - grease
Seals - grease
King pin bushings - grease Trunnion bushings
- grease
Required maintenance procedures and additional
axle information are available in the
Dana 213 Axle Service Manual
(Dana part number ASM-0026E).
Dana 213 Axle Service Manual
Genie part number
57.4700.0028