September 2017
Part No. 57.4400.9219
GTH-1256 AF
3-11
Section 3 • Scheduled Maintenance Procedures
CHECKLIST A PROCEDURES
A-9
Perform 30 Day Service
The 30 day maintenance procedure is a one-time
sequence of procedures to be performed after
the
fi
rst 30 days or 40 hours of usage. After this
interval, refer to the maintenance checklists for
continued scheduled maintenance.
1 Perform the following maintenance procedures:
·
B-5
Inspect the Tires, Wheels and
Lug
Nut
Torque
· D-3
Replace the Hydraulic Tank
Return Filter Element
·
Check
Belt
Tension
·
Check The Engine Mounts
·
Check Hose Clamps
A-10
Perform Axle Maintenance
Note: Axle speci
fi
cations require that this
procedure be performed after 100 hours.
Differential lubricating oil - change
Planetary reduction lubricating oil - change
Dropbox (if any) lubricating oil - change
Negative brake - adjust
Service brake - adjust
Required maintenance procedures and additional
axle information are available in the
Dana 213 Axle Service Manual
(Dana part number ASM-0026E).
Dana 213 Axle Service Manual
Genie part number
57.4700.0028