Operator's Manual
Second Edition • First Printing
Inspections
22
Genie Superlift Contractor
®
Part No. 1314196GT
Test Two-Speed Winch Operation
1 Install a load handling attachment.
2 Shift the winch to the slow speed.
3 Raise the carriage by firmly grasping the winch
handles and rotating them towards the mast.
Result: The winch should operate smoothly,
free of hesitation or binding.
4 Lower the carriage by
firmly grasping the
winch handles and
rotating them away
from the mast. After
lowering to the desired
position, turn the winch
handles toward the
mast (raise the load)
1/4 turn to set the
brakes.
Result: The winch should operate smoothly,
free of hesitation or binding.
5 Shift the winch to the fast speed and repeat
steps 3 and 4.
Test Mast Sequencing
1 Install a load handling attachment.
2 Raise the carriage to full height by firmly
grasping the winch handles and rotating them
towards the mast.
3 Result: The carriage should raise to the top of
the front mast section, followed in consecutive
order by each mast section.
4 Fully lower the carriage. After lowering to the
desired position, turn the winch handles
toward the mast (raise the load) 1/4 turn to set
the brakes.
Summary of Contents for Genie Superlift Contractor
Page 38: ......