29
Setup
Select an area that is firm, level and free of
obstructions.
Follow the Setup procedures in the Function Tests
section.
Raising and Lowering Load
1 Center the load on the load handling
attachment. See Load Capacity Charts
section.
2 Secure the load to the load handling
attachment.
3 Raise the load by firmly
grasping the winch
handles and rotating
them toward the mast.
Do not allow the cable
to wind unevenly onto
the drum.
4 Lower the load by firmly grasping the winch
handles and rotating them away from the
mast. After lowering to the desired position,
turn the winch handles toward the mast (raise
the load) 1/4 turn to set the brakes.
Moving Machine with a Load
It is best to move the machine on the work site
with no load. Moving a raised load should be
restricted to positioning for loading and unloading.
If it is necessary to move the machine with a
raised load, understand and obey the following
safety rules:
Make sure the area is level and clear of
obstructions.
Make sure the load is centered on the load
handling attachment.
Make sure the load is secured to the load
handling attachment.
Avoid sudden starts and stops.
Travel with the load in the lowest possible
position.
Keep personnel away from the machine and
load.
After Each Use
To prepare the machine for storage, follow the
Setup procedure in reverse order.
Select a safe storage location—firm, level surface,
weather protected, clear of obstruction and traffic.
Summary of Contents for Genie Superlift Contractor
Page 38: ......