May 2015
Second Edition - First Printing
Part No. 57.0009.0607
GTH 4016 R - GTH 4018 R - GTH-5021 R 87
Maintenance
A-2
Perform Pre-operation Inspection
Genie specifications require that this procedure be
performed every 8 hours or daily, whichever comes
first.
Completing a Pre-operation Inspection is essential
to proper and safe machine operation. The Pre-
operation Inspection is a visual inspection performed
by the operator prior to each work shift. The inspection
is designed to discover if anything is apparently
wrong with a machine before the operator performs
the function tests. The Pre-operation Inspection
also serves to determine if routine maintenance
procedures are required.
A-3
Perform Function Tests
Genie specifications require that this procedure be
performed every 8 hours or daily, whichever comes
first.
Completing the function tests is essential to safe
machine operation. Function tests are designed to
discover any malfunctions before the machine is put
into service. A malfunctioning machine must never
be used. If malfunctions are discovered, the machine
must be tagged and removed from service.