Section 3 • Scheduled Maintenance Procedures
3 - 16
AL8000HT Light Tower
Part No. 116478
REV A
September 2008
B-5
Perform Engine Maintenance -
Isuzu Models
Note: Engine specifications require that this
procedure be performed every 250 hours or
quarterly, whichever comes first.
Required maintenance procedures and additional
engine information is available in the
Isuzu 4LE1 Diesel Engine Instruction Manual
(Isuzu part number IDE-6033).
Isuzu 4LE1 Diesel Engine Instruction Manual
Terex part number
116133
B-6
Perform Generator Maintenance
Note: Generator specifications require that this
procedure be performed every 250 hours or
quarterly, whichever comes first.
Required maintenance procedures and additional
generator information is available in the
Leroy Somer LSA 37 Installation and
Maintenance Manual (Leroy Somer part number
3664EN-09.2005/B) OR the
Marathon Installation, Operation and Maintenance
Manual (Marathon part number GPN012) OR the
Newage Installation, Service and Maintenance
Manual (Newage part number BCH-018).
Leroy Somer LSA 37 Installation and
Maintenance Manual
Terex part number
116118
Marathon Installation, Operation
and Maintenance Manual
Terex part number
116188
Newage Installation, Service and
Maintenance Manual
Terex part number
830001
CHECKLIST
B
PROCEDURES