Section 3 • Scheduled Maintenance Procedures
3 - 10
AL8000HT Light Tower
Part No. 116478
REV A
September 2008
CHECKLIST
A
PROCEDURES
A-6
Perform Axle Maintenance
Note: Axle specifications require that this procedure
be performed initially and following a wheel change
after the first 10, 25 and 50 miles.
Proper axle maintenance, following the axle
manufacturer's maintenance schedule, is essential
to good axle performance and service life. Failure
to perform the maintenance procedures can lead to
poor axle performance and component damage.
Required maintenance procedures and additional
axle information is available in the
Axis Axle
Operator Maintenance Manual included with your
machine.
Axis Axle Operator Maintenance Manual
Terex part number
116117
A-7
Perform 30 Day Service
The 30 day maintenance procedure is a one time
procedure to be performed after the first 30 days or
40 hours of usage. After this interval, refer to the
maintenance tables for continued scheduled
maintenance.
1 Perform the following maintenance procedures:
· B-3 Inspect the Tires, Wheels and
Lug Nut Torque