![Terex AL8000HT Service Manual Download Page 51](http://html1.mh-extra.com/html/terex/al8000ht/al8000ht_service-manual_1088810051.webp)
Section 3 • Scheduled Maintenance Procedures
Part No. 116478
AL8000HT Light Tower
3 - 29
REV A
September 2008
E-3
Perform Engine Maintenance -
Kubota Models
Note: Engine specifications require that this
procedure be performed every 2 years.
Required maintenance procedures and additional
engine information is available in the
Kubota D-1105 and V-1505 Operator's Manual
(Kubota part number 16683-89169).
Kubota D-1105 and V-1505 Operator's Manual
Terex part number
893020
E-4
Perform Generator Maintenance
Note: Generator specifications require that this
procedure be performed every 4500 hours or every
3 years, whichever comes first.
Required maintenance procedures and additional
generator information is available in the
Leroy Somer LSA 37 Installation and
Maintenance Manual (Leroy Somer part number
3664EN-09.2005/B) OR the
Marathon Installation, Operation and Maintenance
Manual (Marathon part number GPN012) OR the
Newage Installation, Service and Maintenance
Manual (Newage part number BCH-018).
Leroy Somer LSA 37 Installation and
Maintenance Manual
Terex part number
116118
Marathon Installation, Operation
and Maintenance Manual
Terex part number
116188
Newage Installation, Service and
Maintenance Manual
Terex part number
830001
CHECKLIST
E
PROCEDURES