Section 3 • Scheduled Maintenance Procedures
3 - 6
AL8000HT Light Tower
Part No. 116478
September 2008
Instructions
· Make copies of this report to use for
each inspection.
· Select the appropriate checklist(s)
for the type of inspection to be
performed.
Daily or 8 hours
Inspection:
A
Quarterly or 250 hours
Inspection:
A+B
Semi-annually or
500 hours
Inspection:
A+B+C
Annually or
1000 hours
Inspection:
A+B+C+D
Two year or
2000 hours
Inspection:
A+B+C+D+E
· Place a check in the appropriate box
after each inspection procedure is
completed.
· Use the step-by-step procedures in
this section to learn how to perform
these inspections.
· If any inspection receives an “N”, tag
and remove the machine from
service, repair and re-inspect it. After
repair, place a check in the “R” box.
Legend
Y = yes, acceptable
N = no, remove from service
R = repaired
Model
Serial number
Date
Hour meter
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Checklist D
- Rev A
Y N R
D-1 Engine maintenance -
Kubota models
D-2 Tower rotation bearing
bolts
D-3 Hydraulic filter
D-4 Engine maintenance -
Isuzu models
Perform every 1250 hours:
D-5 Engine maintenance -
Isuzu models
Perform every 1500 hours:
D-6 Engine maintenance
D-7 Generator
maintenance
Perform annually:
D-8 Tongue and outrigger
jack maintenance
Perform every 12,000 miles:
D-9 Axle maintenance
Checklist E
- Rev A
Y N R
E-1
Test or replace
hydraulic oil
Perform every 3000 hours:
E-2
Engine maintenance -
Kubota models
Perform every 2 years:
E-3
Engine maintenance -
Kubota models
Perform every 4500 hours:
E-4
Generator
maintenance
Perform every 15,000 hours:
E-5
Generator
maintenance
Comments
MAINTENANCE INSPECTION REPORT