background image

Maintenance of the 

D

evice

    Turn off the energy of device and disconnect it from the connections. Clean the body of 

the device with a slightly damp or dry cloth. Do not use conductive or other chemicals that 

may damage the device as a cleaning materials. After the device is cleaned, make 

connections and make sure that the device is working by energizing the device.

Points to Consider in Current Transformer Selection and Connection

Be careful about the value of the current transformer to be more than the maximum 

current which could be/is

 

attracted from the system.

It is recommended that class of the current transformers (it can be also mentioned 
class, klas, kl, cl ) should be 0,5 which will be used at the compensations.
Only X5A current transformers can be connected to the RGT-

12SVC

.

Be careful about the absence of any load before the current transformers. Otherwise 

there can be differences between reactive and counter.
Current transformer outputs and phase inputs must be in the same order. Connect the 

k-l terminals of the current transformer connected to the L1 phase to the k1-l1 

terminals, the k-l terminals of the current transformer connected to the L2 phase to the 

k2-l2 terminals and the k-l terminals of the current transformer connected to the L3 

phase to the k3-l3 terminals.
While connecting output of the current transformer terminals in order to avoid 

confusion, use different coloured cable for each phase or number the cables.
Pass the cables which is connected to the output of the current transformer far from the 

high voltage line.
It is advised that the cables to be used which are connected to current transformer 
should be minimum 1.5 mm2. It is also recommended that the cables should be 
thickened as the distance increase.
In order to avoid shake at the current transformers, fix to the bus, cables or rail.

The cable distance connected to the current transformer output ends should not be kept long. 
Otherwise there may be errors in the measurements.
Cable connected to current transformer output ends, one piece should be. Otherwise, 
measurements may have errors and current transformer testing may not be possible.

3

CURRENT TRANSFORMER

VALUE

Menu.1.2

4

Quick Installation Guide

Enter Password!
PASS : 0000

    Three-phase capacitor equivalent to 1/40 of current transformer ratio must be connected in 

the first three steps for current transformer test to be performed. Also, the current 

transformer connected to the device and the phase order of the voltages must be the same. 

Otherwise, the device will give phase inverse or step low warning. After fixing the connection 

errors according to the warnings, you can start the device setup again.

Pressing the SET button while on any 

measurement page displays the 

PASSWORD page to enter the menu.

Warning!

While on this page, press the SET button 

to enter the menu.

CURRENT TRANSFORMER

Menu.1.0

MENU

Current Trans. Value

CTR: 1500 / 5A

Menu.1.2.1

While on this page, enter the Current 

Transformer Value in the system using 

the UP and DOWN buttons and then 

press the SET button to save.

    The device will automatically start 

Current Transformer Test operation.

In case of any problems in the 

connections, the device will give a warning 

and will not accept the connection.

    

    According to the warnings, connection 

errors after correcting, you can start 

current transformer test again.

Current Trans.Test(A)

1.Trial

Esc:Cancel

            L1:0.000
            L2:0.000

Please Wait!

            L3:0.000

1

2

     While on this page, press SET button 

to access Current Transformer Menu.
    The Current Transformer Test page 

will appear on the screen. Press the UP 

button to switch to the Current 

Transformer Value page.

3

While in this page, press the SET button 

to enter the Current Transformer Value 

in the system.

Current Transformer Value Entry page 

will be displayed on the screen.

4

5

6

_____________________
TCR

 

%

  

R:23 S:23 T:23

PF:

P :

+Q:

-Q:

S :

Off:

 1.000

 0.000kW

 0.000kVar

 0.000kVar

 0.000kVA

   0.0kVar

Ind(%)

Cap(%)

0.0

0.0

Summary of Contents for RGT-12SVC

Page 1: ...ELEKTR K ELEKTRON K SAN T C A www tense com tr www tenseenerji com Banks Hotels Oil Stations Schools Malls Factories Main Usage Areas RGT 12SVC USER MANUAL...

Page 2: ...e Measurement Screen Inroduction 17 17 Cosinus Page Total Powers Page 17 Ratios Page 17 Voltage and Current Page 18 Instant Powers Page 18 Total Energy Page 18 THD V and THD I page 17 Voltage and Freq...

Page 3: ...0 31 32 33 34 34 27 28 28 29 Advanced Settings Menu Power Factor Correction Power Analysis Samples ModBus RS485 Communication Settings Operating Power Operating Harmonic Delete Logs Generator Settings...

Page 4: ...D I values of Each Phase can be Observed Creating Power Analysis 20 samples 9999 min It Shows The Total Number of Uses of the Steps Encrypted Protection Same Aging in Steps 1 Features About RGT 12SVC...

Page 5: ...ding to the power of the capacitor and reactor and point as connection removing member Use seperate automatic fuse for each feeding inductor of the step conductors Use compensation contactors and disc...

Page 6: ...ust be in the same order Connect the k l terminals of the current transformer connected to the L1 phase to the k1 l1 terminals the k l terminals of the current transformer connected to the L2 phase to...

Page 7: ...ter the Current Transformer Value in the system using the UP and DOWN buttons and then press the SET button to save The device will automatically start Current Transformer Test operation In case of an...

Page 8: ...ing You can check the stored step values on the Step Values screen 2 1 1 in the Step Menu When current transformer test is successful this page will be displayed on the screen If the operation is conf...

Page 9: ...e screen When the RIGHT button is pressed phase phase voltage values are displayed Figure 5 Phase Neutral voltage and current values are displayed on the screen Figure 6 Instantaneous power values of...

Page 10: ...ure 4 In this menu you can see Step Values take Step Measurement change Step Time Settings make PFC settings Make Step Control Manually Enter Step Value and set Auto Step Measurement Period Advanced S...

Page 11: ...ps Harmonic Filter Kondansat r Thermal A2 2A 6A A1 L C1 C2 C3 C4 C5 C6 2A Voltages Input Voltages Output SRL XXT 1 2 3 L1 N in1 in2 Thermal Shunt Reactors Coil Coil Coil Thermal Thermal Thermal in3 L2...

Page 12: ...instantaneous rate less than 15 If it is low this led will light 4 Buttons They are used to monitor measurements and make adjustments ESC Button When pressed in the menu it returns to the upper menu...

Page 13: ...een Press the UP button to switch to the Current Transformer Value page While in this page press the SET button to enter the Current Transformer Value in the system Current Transformer Value Entry pag...

Page 14: ...his page press SET button to enter Current Transformer Menu The Current Transformer Test page will appear on the screen Press the UP button to switch to the Current Transformer Value page CURRENT TRAN...

Page 15: ...links The device will fix these connections software wise During the step measurement this page will be displayed on the screen all steps will be measured in order and their values will be displayed...

Page 16: ...The device will fix these connections software wise Current Trans Test Yes No Menu 1 1 1 CURRENT TRANSFORMER TEST Menu 1 1 Enter Password PASS 0000 Three phase capacitor equivalent to 1 40 of current...

Page 17: ...is used to select all the steps and TCR is used to measure shunt reactors connected to the drive Menu 2 2 1 Measure 01 05 09 02 06 10 03 07 11 TCR ALL 04 08 12 After the selected steps are measured th...

Page 18: ...6 1 Step Approved Example On the screen above the three phase 10kVAr capacitor value has been entered in the 1st step If the value to be entered is single phase L1 L2 or L3 should be selected from th...

Page 19: ...button In this page you can navigate between the steps with UP DOWN buttons you can use the RIGHT button to control activate the steps and passive the active steps Active steps are indicated by the si...

Page 20: ...e password page is displayed for entering the menu When ESC button is pressed Home Page Total Powers is displayed Ratios Ind Cap Instant 0 3 0 2 Hourly 0 3 0 2 Daily 0 3 0 2 Energy 0 3 0 2 ___________...

Page 21: ...yed When the SET button is pressed the password page is displayed for entering the menu When ESC button is pressed Home Page Total Powers is displayed THD V THD I L1 100 0 L1 100 0 L2 100 0 L2 100 0 L...

Page 22: ...Connection Learned If the operation is confirmed by pressing the SET button the device will automatically start the Step Measurement process After the test it indicates that the current transformer t...

Page 23: ...ween the steps with UP DOWN buttons select the steps you want to measure with the RIGHT button and start the measurement process by pressing the SET button The stages selected for the measurement are...

Page 24: ...steps at once it determines the time to wait between the steps Factory Setting 400msec Setting Range 100msec 3000msec KADEME OLCUMU Menu 2 2 SettingsE Step MenuE PFC Settings PFC SETTINGS Menu 2 4 PFC...

Page 25: ...he Step Approved notification appear on the screen To exit without saving pressing the ESC button will return to the Manual Step Value Set page Example On the screen above the three phase 10kVAr capac...

Page 26: ...2 7 1 Settings E Advanced Settings Menu It is the third menu that appears when you proceed by pressing the UP button after entering the settings page In this menu Compensation Target Value can be set...

Page 27: ...ve powers drawn from each phase are recorded along with their duration capacitive powers are indicated by a sign If the power consumption remains constant over a certain period of time it is recorded...

Page 28: ...ive Menu 3 4 1 Voltage V Curr A L1 220 0 L1 380 0 L2 220 0 L2 380 0 L3 220 0 L3 380 0 _____________________ ALR Low Voltage It is the fifth of the 8 different setting parameters in the advanced settin...

Page 29: ...while the Generator Compensation page is on the screen In this page you can navigate between the parameters Control Set and Tolerance with the RIGHT button and change the value in the selected parame...

Page 30: ...ontact is activated When the alarm mode is passive no warning is given Settings E Advanced Settings Menu E PF Correction Alarm Settings E Device Settings Menu It is the fourth menu that appears when y...

Page 31: ...he default password value 0000 the new password will need to be entered each time it is desired to enter the Settings menu Settings E Device Settings Menu E Change Password It is the third of 4 differ...

Page 32: ...the end of the set time It is the last of the 4 different setting parameters in the device settings menu To change the backlight off time press the SET button while the Backlight Settings page is on t...

Page 33: ...ection Q 4 3 Phase Connection Q 3 2 Phase Connection Bridge Q 3 Capacitor Powers 0 16 KVAR 0 33 KVAR 0 5 KVAR 0 83 KVAR 1 66 KVAR 2 5 KVAR 3 33 KVAR 5 KVAR 6 66 KVAR 8 33 KVAR 10 KVAR 0 16 KVAR 0 33 K...

Page 34: ...L1 Capacitor kvar Single phase L2 Capacitor kvar Single phase L3 Capacitor kvar Step Value Determination According to Power Analysis Samples Three Phase capacitors have the lowest 0 5kVAr and the hig...

Page 35: ...99 00 0 1200 Even 1 1 5000 5 30 30 A sec sec 99 99 60 270 210 60 50 50 60 3000 99 00 26 19200 Odd 2 247 sec msec kVAr week bps sec V V sec Set Value Tolerance Value 0 50 1 0 50 10 0 It can be active...

Page 36: ...33 Dimensions 138mm 147mm 114 5mm 147mm 138mm Back View 147mm Front View 147mm Left Side View 138mm 43mm 22mm Fixing apparatus Screw fixing apparatus 45mm 34mm 6mm 143mm...

Page 37: ...ccuracy Reactive Power Accuraacy Harmonic Voltage Measuring Range Harmonic Current Measuring Range 100V 300V AC 50 60 Hz 12VA 20 C 55 C 30 C 80 C 90 5mA 5 5A 2 9 128x64 Graphic LCD and LEDs 1 5mm 2 5m...

Page 38: ...ELEKTR K ELEKTRON K SAN T C A Document Number DK 094 2 Rev 1 10_200317 QUALITY SOLUTIONS MADE IN TURKEY Energy and Compensation Tracking System www tenseenerji com...

Reviews: