OC441665
Release 1. 22jan16jh
This document is TELMA’s property. It cannot be either forwarded to an outsider, printed, reproduced or disclosed without TELMA’s authorization. Page
17 / 23
4-L 4-M
4-N 4-O
On axle side, toggle completely the pole
shoes plate to the poles.
Take care not to wedge the spring washers with
the poles during toggling.
Put in place by hand, 15 new screws:
-
Put the 4 screws to the fixation pads 1
st
-
Put the 3 screws to the hub
-
Put the 8 screws to the pole shoes.
Tighten screws at the nominal torque (25
Nm +/- 20%) (18 lb-ft±20%) following specific
order, described on point
4-O
.
Use a Torx® TX40 wrench.
Tighten screws, starting by:
-
The 8 screws of the pole shoes.
-
The 3 screws to the hub.
-
The 4 screws to the fixation pads.
1
2
3
4
5
6
9
10
11
12
15
14
13
8
7