![Teledyne TapTone T4000 APX Installation Manual Download Page 35](http://html1.mh-extra.com/html/teledyne-taptone/t4000-apx/t4000-apx_installation-manual_1081094035.webp)
M-412-064 Chapter 3: Installation Instructions
TELEDYNE TAPTONE
28
3.4.3 Connecting the Air
STEPS:
1. The air supply should be clean and dry with a maximum line pressure of 10.3 bar (150
psi).
2. Connect the shop air supply to the input side of the regulator assembly supplied with
the system.
3. Turn air supply ON and set the pressure of the regulator to a reading of approximately
2.7 bar (60 psi). The regulator pressure may be adjusted as required, to achieve
proper removal of rejected containers.
Figure 3-11 Rejector Regulator / Lubricator Air Connections