52
The list of commissioning operations and checks is shown in Table 15 below. Initial state of VCB components
before checks: ISM - open, CM - deenergized. Main circuits of ISM shall be disconnected/isolated from the main
circuits of substation to avoid high voltage being applied to the ISM before the commissioning procedure
completion. Commissioning and maintenance is only permitted for qualified and trained personnel.
Operation description
Required tool
Approximate timing
Tests at the end of installation
Check for damage, remove any dirt or
contamination
Visual check, no tool is required
2 minutes
Unsupported busbar length shall be
according to Table 2 for LD ISM and
Table 4 for HD ISM
Ruler, tape measure or calliper -
depends on distance value and place
of measurement execution
2 minutes
Fixing points shall be according to
Visual check, no tool is required
1 minute
Bolts and torques shall be according to
Torque wrench according to torque
value
2 minutes
Clearances shall be according to
Ruler, tape measure or calliper -
depends on distance value and place
of measurement execution
2 minutes
Protective earthing shall be according
Visual check, no tool is required
1 minute
Check that free air circulation at ISM is
possible
Visual check, no tool is required
1 minute
Installation of CM shall be according
Visual check, no tool is required
1 minute
Availability of the CM auxiliary power
supply. It is recommended to use the
same auxiliary power supply as for
protection and control devices. Type
of voltage and voltage level according
to selected CM type
Voltmeter with measurement range
according to expected power supply
voltage value
2 minutes
Polarity of auxiliary power supply and
selection of MCB shall be according to
Check of compliance between ISM
type on ISM serial number plate and
on CM designation label
DC voltmeter with measurement range
according to expected power supply
voltage value - for voltage polarity
check.
Visual check, no tool is required - for
MCB check
2 minutes
Connection between CM and ISM
shall be according to subchapter 4.2.5
Multimeter - for validation of correct
wiring connections (utilizing the
continuity function of the meter)
5 minutes
Checking that all secondary
connections have been secured
adequately
Visual and mechanical check of
connections, no tool is required
2 minutes
Checking whether the CM, ISM are
connected according to project/
product documentation and according
to circuit diagrams in Appendix 3
Multimeter - for validation of correct
wiring connections (utilizing the
continuity function of the meter)
5 minutes
Table 15 - List of commissioning operations and check-ups
Summary of Contents for TAVRIDA ELECTRIC VCB15 LD
Page 1: ...VCB Vacuum Circuit Breaker 17 5kV 31 5kA 2000A 24kV 16kA 800A User Guide...
Page 3: ...1 Product description...
Page 7: ...2 Nameplates and seals...
Page 11: ...3 Product handling...
Page 23: ...4 Installation...
Page 50: ...5 Commissioning...
Page 57: ...6 Operation...
Page 61: ...7 Maintenance and troubleshooting...
Page 66: ...8 Disposal...
Page 68: ...Appendix 1 Product range...
Page 71: ...Appendix 2 Overall drawings...
Page 74: ...75 ISM15_LD_3 Weight 13 kg ISM15_LD_6 PCD 133 mm Weight 55 kg...
Page 81: ...82 ISM25_LD_2 1 PCD 150 mm Weight 35 kg ISM25_LD_2 2 PCD 150 mm Weight 37 kg...
Page 85: ...Appendix 3 Secondary schemes...
Page 86: ...87...
Page 87: ...88...
Page 88: ...89...
Page 89: ...90...
Page 90: ...91...
Page 91: ...92...
Page 92: ...93...