![Tektronix P6249 Instruction Manual Download Page 61](http://html1.mh-extra.com/html/tektronix/p6249/p6249_instruction-manual_1077387061.webp)
Maintenance
P6249 4 GHz 5X Active Probe Instruction Manual
49
To replace the covers, follow these steps:
1.
Align the tabs with the notches on the cover halves. Refer to
Figure 19.
2.
Press the cover tabs in so that the cover can be lowered.
3.
Slide the tabs into the notches.
4.
Firmly press the pieces together until the cover catches snap into
place.
Tabs (4)
Figure 19: Replacing the compensation box cover
Summary of Contents for P6249
Page 1: ...Instruction Manual P6249 4 GHz 5X Active Probe 071 0538 05 www tektronix com...
Page 4: ......
Page 8: ...Table of Contents iv P6249 4 GHz 5X Active Probe Instruction Manual...
Page 28: ...Functional Check 16 P6249 4 GHz 5X Active Probe Instruction Manual...
Page 34: ...Helpful Hints 22 P6249 4 GHz 5X Active Probe Instruction Manual...
Page 40: ......
Page 44: ...Theory of Operation 32 P6249 4 GHz 5X Active Probe Instruction Manual...
Page 54: ...Performance Verification 42 P6249 4 GHz 5X Active Probe Instruction Manual...
Page 64: ...Maintenance 52 P6249 4 GHz 5X Active Probe Instruction Manual...
Page 68: ...Troubleshooting 56 P6249 4 GHz 5X Active Probe Instruction Manual...