VOT1; Rev 1.5; EN; 5.11.2015
TKT66
– Installation and maintenance
8
Central battery unit
type
Output circuits
Total load capacity in battery use with 1-
hour and 3-hour operating time
TKT6608C(N)(P)xxx
1x
(8x350W/ 4x700W/2x1400W)
or 1,6A circuit, Max. 2580VA
1 h 2580 W 18x38 Ah
3 h 2580 W 18x65 Ah
TKT6608C(N)
(P)xxxF
1x
(8x350W/ 4x700W/2x1400W)
or 1,6A circuit, Max.2800VA
1 h 2580 W 18x38 Ah
3 h 2800 W 18x65 Ah
TKT6616C(N)(P)xxx
2x
(8x350W/ 4x700W/2x1400W)
or 1,6A circuit, Max.2580VA
1 h 5600 W 18x65 Ah
3 h 3340 W 18x65 Ah
TKT6616C(N)
(P)xxxF
2x
(8x350W/ 4x700W/2x1400W)
or 1,6A circuit, Max.5600VA
1 h 5600 W 18x65 Ah
3 h 3340 W 18x65 Ah
TKT6624C(N)(P)xxx
3x
(8x350W/ 4x700W/2x1400W)
or 1,6A circuit, Max.2580VA
1 h 6000 W 18x65 Ah
3 h 3340 W 18x65 Ah
TKT6624C(N)
(P)xxxF
3x
(8x350W/ 4x700W/2x1400W)
or 1,6A circuit, Max.8400VA
1 h 6000 W 18x65 Ah
3 h 3340 W 18x65 Ah
The central battery unit is equipped with a mains fuse F1 in the connecting terminal and with battery
circuit fuses F2 and F3. The output circuits’ fuses are on the top end of casing at connectors 1-2.
For more information, see chapter
The charging system of the central battery unit is equipped with a temperature compensation of the
battery charging voltage, which is approximately 0.06 V/°C (5 mV/°C/cell).
NOTE:
The luminaires used with the central battery unit must be suitable for both AC and DC supply.
3.8 Directives and standards
The following directives and standards were applied in designing and manufacturing the central battery unit:
Quality:
ISO 9001: 2008;
(certified quality system)
Environment:
ISO 14001: 2004;
(certified environment system)
Electrical safety:
2006/95/EY
LVD directive
Device standard:
EN 50171: 2001;
Central power supply systems
EN 50272-2: 2001;
Safety requirements for secondary
battery installations Part 2:
Stationary batteries
EN 60439-1 + A1: 2005;
Distribution units. Part 1:
Requirements for type tested and
partly type tested units.
IEC 62034: 2006;
Automatic test systems for battery
powered emergency escape lighting
Summary of Contents for TKT66
Page 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...
Page 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...
Page 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...
Page 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...
Page 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...
Page 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...
Page 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...
Page 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...
Page 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...
Page 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...
Page 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...
Page 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...
Page 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...
Page 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...
Page 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...
Page 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...
Page 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...
Page 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...
Page 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...