5.3 Commissioning
All operations related to the system installation and commissioning must be performed by a
skilled electrician.
The two empty columns of the type label inside the central battery unit shall be marked with the
total load connected to the central battery unit and the nominal battery mode duration.
5.3.1 Setting of battery capacity
The charging current has been set to minimum at the factory. The charging current must be set /
checked as follows:
1. Set the current on the TS5 XST0201(B) DIP switch according to the guidelines in the illustration
below.
NOTE:
The charging current must ALWAYS be set / checked based on the number of ampere-hours
(Ah) in the batteries used. Incorrect settings may damage the batteries. When all dip switches are set to
'OFF' position, the charging current is set correctly for 65 Ah batteries. Other battery sizes are as shown
in the sticker. The sticker shows a setting for a 7 Ah charging current as an example.
NOTE: THE CHARGING CURRENT SHALL ALWAYS BE SET WITH MAINS SUPPLY OFF. ONLY
ONE DIP SWITCH IS ALLOWED TO BE SWITCHED ON AT THE SAME TIME.
1 = 7 Ah
2 = 17 Ah
3 = 24 Ah
4 = 38 Ah
ALL OFF = 65 Ah
5 = NC
6 = NC
Forced charge button for
batteries
Summary of Contents for TKT66
Page 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...
Page 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...
Page 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...
Page 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...
Page 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...
Page 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...
Page 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...
Page 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...
Page 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...
Page 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...
Page 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...
Page 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...
Page 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...
Page 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...
Page 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...
Page 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...
Page 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...
Page 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...
Page 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...