VOT1; Rev 1.5; EN; 5.11.2015
TKT66
– Installation and maintenance
22
flash when its circuit number is
shown on the display.
If luminaire test will not start, check
battery voltage level. It must be
more than
200 VDC.
LOCAL CONTR.
ALARM
The central battery unit can be remote
controlled to send a local controller pulse to all
circuits, in which case all the non-maintained
addressable luminaires (Teknoware types
ending with
–K, or external luminaires fitted
with Teknoware address module) that are
connected to the central battery unit are
switched on. This feature can be activated by
opening loop 68-69.
If the LED is lit, the loop 68-69 is open.
If the LED is blinking slowly, K-model
luminaires are turned on from the menu
with AC voltage.
.
Check the loop between connectors
68-69.
FUSE FAULT
If the LED is lit, there is a faulty fuse in the
control module.
If the LED is blinking slowly, there is a
faulty fuse in the circuit shown on the
display.
If the LED is blinking quickly, there is
some other fault in the circuit shown on
the display.
Check all circuit output fuses.
EXTERNAL FAULT
Alarms when an external fault is detected in
the battery or the luminaire, the battery or the
luminaire test has failed.
If the LED is flashing with
Luminaire test
LED,
configuration is in progress.
Check that all luminaires are
working.
INTERNAL FAULT
If the LED is lit continuously, there is a fault in
the battery or charging circuit. i.e. the alarm is
coming from the Central Module
If the LED is flashing, there is a fault in a
circuit output fuse or output circuit
Check if battery or charger is faulty.
Measure voltage level of batteries.
In normal situation it should be
243-255 VDC.
Summary of Contents for TKT66
Page 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...
Page 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...
Page 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...
Page 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...
Page 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...
Page 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...
Page 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...
Page 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...
Page 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...
Page 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...
Page 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...
Page 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...
Page 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...
Page 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...
Page 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...
Page 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...
Page 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...
Page 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...
Page 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...