VOT1; Rev 1.5; EN; 5.11.2015
TKT66
– Installation and maintenance
34
The example shows a test date and time, as well as the test result,
OK
or
ERROR
. You can browse
the log by pressing the
+/-
buttons. If you want to view the test results for a particular date, use the
+/-
buttons to select the desired date, and then accept your selection by briefly pressing the
SETUP
button.
To move back to the higher-level menu from the test log, press the
SETUP
button.
A central battery system may house 1 to 3 changeover boards, each with 8 outputs. Each output circuit
may have 32 luminaires, shown in displays 16 LO and 16 HI. If only 16 luminaires are available, HI and
LO are not shown in the display. If the central battery system makes use of more than one change over
boards, you can select the data for a desired board by first pressing the
+/-
buttons and then confirming
your selection by pressing the
SETUP
button. The symbols used in the display indicate the following.
O = OK
# = Error
? = Luminaire not recognised (a luminaire has been added; automatic configuration is not in operation)
- = Luminaire is not connected
Test 23.03.2011 10:30
Change over board 1-
#OO…..
Change over board 2-
OO…..
Figure 5. Luminaire tests with change over boards
The "1- #OO" symbol for changeover board 1 indicates an error in output circuit 1.
The "2- OO" symbols for changeover board 2 indicate that output circuit 2 has no errors.
If you want to view the data for a particular changeover board, first select the board using the
+/-
buttons, then confirm your selection by pressing the
SETUP
button. To move back to the higher-level
menu from the test log, press the
SETUP
button for 1.5 s.
You can use the data display for change over boards to view data for any output circuit. You can
browse the output circuits by pressing the
+/-
buttons. To view the data for luminaires, press the
SETUP
button. If the luminaires have been given names using a PC programme, the names are shown on the
last line. To move back to the higher-level menu from the test log, press the
SETUP
button for 1.5 s.
CHANGE OVER BOARD 1, OUTPUT CIRCUIT>1
HI: OOOOOOOOOOOOOOOO
LO: O#OO…………
Figure 6. Luminaire tests, output circuit data
The dots indicate a vacant address, O = OK and # = ERROR. Twenty luminaires have been
interconnected to provide service in a output circuit, with luminaire 2 malfunctioning (LO 2).
8.1.5 Battery test history
You can browse the battery test log for detailed information on battery tests. You can view battery test
results, if the central battery systems has performed an automatic battery test, or if a manual test has
been carried out. The battery test log contains test dates, test times and test results. If you want to view
the data for a particular battery test, first select the desired date using the
+/-
buttons, then confirm your
selection by pressing the
SETUP
button. To move back to the higher-level menu from the test log,
press the
SETUP
button for 1.5 s.
Figure 7. Main menu Browse battery tests
Browse luminaire tests
Browse battery tests
Browse error log
Setup
Date Time Log
23.03.11 10:30 Error
24.03.11 10:30 OK
End of log
Summary of Contents for TKT66
Page 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...
Page 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...
Page 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...
Page 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...
Page 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...
Page 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...
Page 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...
Page 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...
Page 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...
Page 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...
Page 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...
Page 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...
Page 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...
Page 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...
Page 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...
Page 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...
Page 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...
Page 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...
Page 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...