VOT1; Rev 1.5; EN; 5.11.2015
TKT66
– Installation and maintenance
16
3. Acknowledge by pressing the
MENU / OK
button again.
Printing of the report will start.
NOTE:
Printing of the reports is
blocked during the tests.
2 TESTING
Use this option to select a test to be started or
interrupted.
1
= Start of the luminaire test.
2
= Interruption of the luminaire test.
3
= Start of battery test for 2/3 of the time (the
same time as in the automatic test).
4
= Start of the battery test for the set operating
time (1 or 3 hours).
5
= Start of the battery test until the end of its
duration
– the battery will be discharged.
6
= Interruption of the battery test /
acknowledging of a battery fault.
7 =
Stop the local controller function or the
BLINK mode.
8 =
Start the local controller function.
9 =
Start the BLINK mode.
10
= Reconfiguration.
To start or interrupt a test,
1. Go to the menu with the
MENU / OK
button.
2. Press the
BROWSE
button until
the
TESTING
led is lit.
3. Press the
SET
button until the
value you wish to select shows in
the display.
For example 6 = Interrupt the
battery test.
4. Acknowledge by pressing the
MENU / OK
button again.
The required action begins.
3 SETUP
Use this option to remove the settings locking to
change the operational settings of the central
battery unit.
To remove the settings locking,
1. Go to the menu with the
MENU /
OK
button.
2. Press the
BROWSE
button until
the
SETUP
led is lit.
3. Press the
SET
button so that
number “1” shows in the display.
4. Acknowledge by pressing the
BROWSE
button again.
The settings locking is removed and
you can now change the operational
settings.
Summary of Contents for TKT66
Page 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...
Page 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...
Page 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...
Page 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...
Page 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...
Page 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...
Page 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...
Page 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...
Page 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...
Page 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...
Page 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...
Page 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...
Page 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...
Page 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...
Page 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...
Page 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...
Page 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...
Page 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...
Page 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...