VOT 34; Rev 1.81; EN; 11.12.2019
TKT65C
– Installation and maintenance
27
Before using the Forced charging of batteries, test each battery separately with a battery tester.
There is a button for forced charging in the charger board. If the battery voltage is under 110 V, push
this button for 1-2 min and measure the battery voltage at the same time. Charging starts automatically
when battery voltage rises up over 110 VDC. If the batteries, the main input voltage and all fuses are
OK and the
charger doesn’t charge, it is broken. It has to be replaced with a new one.
Checking the luminaire circuits one at a time
The circuit-specific checking can be done using either addressable or circuit monitoring. The central
battery unit can either be configured or not.
To check the functionality of a single circuit,
6. Press the BROWSE button until the display shows the number of the circuit whose luminaires'
functionality you want to check.
7. Press the MENU / OK button.
8. Use the BROWSE button to select 2,
Testing
.
9. Use the SET button to select 1 = Starting the luminaire test
10. Accept the selection with the MENU / OK button.
LED
Explanation
Luminaire test
is flashing
External fault
is flashing
Checking luminaire circuits on at a time is running.
As the checking process progresses, the LEDs will show the luminaires found in the circuit or the total
input power of the circuit. Once the test is complete, you can use the BROWSE button to have the
central battery unit display the tested luminaire circuits and the luminaires detected in them or the total
input power of the circuit.
Configuration
It is advisable to check before the configuration that all the luminaires are actually working, because the
configuration will teach the functionality of the existing luminaires to the testing system. The learned
configuration will then be used as a reference for all future tests.
NOTE: When CIRCUIT MONITORING is used, the central battery unit and the maintained luminaires
must be allowed to warm up for at least one (1) hour before the final configuration. This is essential,
because the warm-up time allows the luminaire currents to normalise.
The warm-up is carried out by running a luminaire test, as instructed under LUMINAIRE TEST in
chapter
. The warm-up phase is not necessary when using addressable
monitoring.
In addressable monitoring, the central battery unit sends inquiries to the circuits in order to determine
the luminaires in the circuits.
In circuit monitoring, the central battery unit will wait for a few minutes and let the luminaires warm up
before measuring the current in each circuit. The first luminaire test is automatically a configuration. The
configuration cannot be interrupted. The results of later tests are compared with the configuration data.
Summary of Contents for TAPSA CONTROL TKT65
Page 43: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 43...
Page 44: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 44...
Page 45: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 45...
Page 46: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 46...
Page 47: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 47...
Page 48: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 48...
Page 49: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 49...
Page 50: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 50...
Page 51: ...VOT 34 Rev 1 81 EN 11 12 2019 TKT65C Installation and maintenance 51...