Section:
Description:
Page No:
Date:
PLATES INSTALLATION
Jun 2017
8 of 8
HAB_302b
POWER POLE - MID & CEILING FEED
ELECTRICS
STEP 11: Push T-nuts inside holes from the top of the ceiling tile. Wrap Cover plates around the Power Pole and fasten using hardware provided.
D
E
C
Detail View
NOTE: Temporarily
remove plates, in order to
push T-nuts into
pre-drilled holes,. Bring
them back and fasten
everything, as shown.