STEP 13: Place Control Box into Worksurface Channel and slide it onto Worksurface Channel
Support Plate. Connect Legs and Switch to Control Box.
Section:
Description:
Page No:
Date:
INSTALL CONTROL BOX
DETAIL
HAB_111
8 of 10
July 2017
FRAMES & WORKSURFACES
FRAMES & WORKSURFACES
Underside View
Note: Gables & Cable
Tray not shown
D5
D2
Support Plate -
Worksurface
Channel
D6
D4
D6
To Switch
To Legs
Front
Back
Make sure to insert
through E-Chain
NOTE: Electrical Power
Plug should be installed
facing the location of the
power box.