Section:
Description:
Page No:
Date:
CABLE CHAIN ASSEMBLY
Aug 2017
12 of 16
HAB_203b
SOLID GABLES & CABLE CHANNEL
SCREENS AND GABLES
NOTE: Electrics
components have to
installed on Cable Channel
before connecting to
Support Bracket. Please
refer to Installation Guide
301, 302a or 302b for
corresponding Electrics
installation.
B3
B10
B7
B11
High Capacity
Power Module
Standard Power Module
Base Feed
Power Module
Cover
E-Chain
B9
B8
NOTE: Install Cable Channel
Cover Plate (B9) on Cable
Channel where E-Chain is not
specified or unused location.