STEP FIVE 

——————

 TESTING THE WIRING

 General

Each terminal block must be unplugged from its header on the control before power is applied for testing. To remove the terminal 
block, pull straight down from the control.

The following tests are to be performed using standard testing practices and procedures and should only be carried out by 
properly trained and experienced persons.

A good quality electrical test meter, capable of reading from at least 0 – 300 V (ac) and at least 0 – 2,000,000 Ohms, is essential 
to properly test the wiring and sensors.

2

Boil

Sup

1

Com

 

Test the Sensors

In order to test the sensors, the actual temperature at each sensor 
location must be measured. A good quality digital thermometer with 
a surface temperature probe is recommended for ease of use and 
accuracy. Where a digital thermometer is not available, a spare sensor 
can be strapped alongside the one to be tested and the readings 
compared. Test the sensors according to the instructions in the Data 
Brochure D 070.

 Test the Power Supply

Make sure exposed wires and bare terminals are not in contact with other 
wires or grounded surfaces. Turn on the power and measure the voltage 
between the 

Power

 

L

 and 

Power

 

N

 terminals (13 and 14) using an AC 

voltmeter, the reading should be between 103.5 and 126.5 V (ac).

 Test the Powered Inputs

Boiler Demand

If a boiler demand is used, measure the voltage between the 

Boil

 

Dem

 and 

Com

 

Dem

 terminals (29 and 30). When the boiler 

demand device calls for heat, a voltage between 20 and 260 V (ac) 
should  be  measured  at  the  terminals.  When  the  boiler  demand 
device is off, less than 5 V (ac) should be measured.

DHW Demand

If a DHW demand is used, measure the voltage between the 

Setp

 

/

 

DHW

 and the 

Com

 

Dem

 terminals (31 and 30). When the 

DHW demand device calls for heat, a voltage between 20 and 
260 V (ac) should be measured at the terminals. When the DHW 
demand device is off, less than 5 V (ac) should be measured.

Setpoint Demand

If a setpoint demand is used, measure the voltage between the 

Setp

 

/

 

DHW

 and the 

Com

 

Dem

 terminals (31 and 30). When the 

setpoint demand device calls for heat, a voltage between 20 and 
260 V (ac) should be measured at the terminals. When the setpoint 
demand device is off, less than 5 V (ac) should be measured.

External Input

If an external input is used, measure the voltage between the 

Com –

 and the 

Out +

 terminals (1 and 4). When the external input 

device calls for heat, a voltage between 0 and 10 V (dc) should be 
measured at the terminals.

14

Power

13

V

103.5 to 126.5 V (ac)

N

L

20 to 260 V (ac)

30

29

Boil

Dem

Com

Dem

20 to 260 V (ac)

31

30

Com

Dem

Setp/

Dem

1

2 3

4

Com

Boil

Ret

Out

+

Boil

Sup

500Ω

0 - 10 V (dc)

0 - 20 mA

OR

V

Summary of Contents for Boiler Control 265

Page 1: ...dulating Boiler Output Boiler Enable Output Pump Output Boiler Enable or Pump Input Setpoint or DHW Demand Input 115 V ac Power Supply Output Primary Pump Input Timer or Switch Optional Output Combust...

Page 2: ...he 265 has four push buttons Menu Item for selecting and adjusting settings As you program your control record your settings in the ADJUST Menu table which is found in the second half of this brochure...

Page 3: ...ontrol is in UnOccupied Mode Primary Pump Displays when the primary pump relay is turned on Occupied Schedule Displays when the control is in Occupied Mode Boiler Pump Displays which boiler pump relay...

Page 4: ...ply water temperature to a hydronic space heating system or setpoint When using the control to provide Domestic Hot Water DHW requirements only two modulating boilers can be operated The supply water...

Page 5: ...t setting This alert can be used to determine if the boilers have failed to fire To reset the alert press and hold the and buttons for 5 seconds while in the VIEW menu ROTATION The control includes an...

Page 6: ...ATION Boiler 1 Boiler 2 Boiler 3 100 MOD OFF PARALLEL MODULATION Boiler 1 Boiler 2 Boiler 3 MOD MOD MOD SEQUENTIAL MODULATION The control offers a sequential modulation option This is selected by sett...

Page 7: ...culate the Maximum Modulation use the following formulae For 4 to 20 mA Maximum Modulation 4 mA Boiler s Maximum Input Signal x 100 4 20 mA For 0 to 10 V dc Maximum Modulation 0 V dc Boiler s Maximum...

Page 8: ...onse rate it may be necessary to increase the Motor Speed setting in order to increase the stability of the boiler modulation Example 1 A boiler s input signal range is 2 to 9 V dc The 265 control has...

Page 9: ...ve PID logic in order to satisfy the boiler target temperature Fixed Differential If the user desires to have a fixed differential this is set using the boiler differential setting in the ADJUST menu...

Page 10: ...to thermally shock a boiler when it is shut off at high fire The Soft Stop feature forces the boiler to modulate down to minimum before turning off This is designed to prevent large volumes of cold ai...

Page 11: ...49 C 140 F 60 C 190 F 88 C 180 F 82 C 160 F 71 C 150 F 66 C BOIL MAX 140 F 60 C 160 F 71 C 210 F 99 C 200 F 93 C 180 F 82 C 170 F 77 C BOIL MIN OFF OFF 140 F 60 C 140 F 60 C 140 F 60 C 140 F 60 C High...

Page 12: ...nter in the display When the control is in WWSD the Boiler Demand pointer is displayed if there is a boiler demand However the control does not operate the heating system to satisfy this demand The co...

Page 13: ...HG The DHW demand overrides the boiler reset target temperature except when the boiler reset target is higher than the DHW Exchange setting DHW MODE AND PRIORITY OPERATION The control has five differe...

Page 14: ...nues this purge for a maximum of two minutes or until the boiler supply water temperature drops 20 F 11 C below the boiler target temperature during the DHW operation The control also stops the purge...

Page 15: ...the boiler supply temperature is sufficiently reduced the Boiler 3 DHW contact shuts off The heating system is turned on for a period of time to prevent the building from cooling off After a period o...

Page 16: ...iler SETP MODE 2 Setpoint in Parallel with Priority Whenever a setpoint demand is present the boiler s is operated to maintain the setpoint target and the primary pump Prim P1 contact is opened It is...

Page 17: ...mary pump and boiler pumps operate as described in section G INPUT SIGNAL The control can accept either a 0 10 V dc signal or a 2 10 V dc signal The External Input Signal setting must be set to the pr...

Page 18: ...Pump Boiler Pumps Primary Pump Boiler Pumps Primary Pump Boiler Pumps OR Example Range 0 10 V dc Input 7 V dc 157 F 69 C Offset 5 F 3 C 5 F 3 C Boiler Target 162 F 72 C CONVERSION TABLE 0 10 0 20 mA 0...

Page 19: ...g to cross between sections as the wires will interfere with safety dividers which should be installed at a later time Power must not be applied to any of the wires during the rough in wiring stage Al...

Page 20: ...DHW MODE must also be set to 1 through 4 Setpoint Demand To generate a Setpoint Demand a voltage between 24 V ac and 230 V ac must be applied across the Setp DHW Dem and Com Dem terminals 31 and 30 T...

Page 21: ...There is no power available on these terminals from the control These terminals are to be used as a switch to enable the modulating boiler Since this is an isolated contact it may switch a voltage be...

Page 22: ...to 0 to 10 V dc using an external 500 resistor across the Mod 1 Mod 2 Mod 3 terminals The 4 to 20 mA output can be converted to a 0 135 output for a Modutrol IV gas valve actuating motor using a 0 135...

Page 23: ...the control to measure the boiler supply water temperature Boiler Return Sensor Connect the two wires from the Boiler Return Sensor 071 to the Com and Boil terminals 1 and 3 The boiler return sensor i...

Page 24: ...3 and 14 using an AC voltmeter the reading should be between 103 5 and 126 5 V ac Test the Powered Inputs Boiler Demand If a boiler demand is used measure the voltage between the Boil Dem and Com Dem...

Page 25: ...2 are running If the boiler s operates properly disconnect the power and remove the jumper Boiler 3 DHW Contact Boiler Operation If a boiler is connected to the Boiler 3 DHW contact 21 and 22 make sur...

Page 26: ...switch settings change the items that are available to be viewed and or adjusted in the User Interface If a DIP switch is changed while the control is powered up the control responds to the change in...

Page 27: ...h is set to Exercise the pumps are operated for 10 seconds after every three days of inactivity Parallel Sequential The Parallel Sequential DIP switch selects whether to modulate the boilers using par...

Page 28: ...0 Boiler 2 Modulation Current percent modulation of the boiler s burner This item is only available when Boiler 2 is set to Au automatic or CP1 copy 1 0 to 100 Boiler 3 Modulation Current percent modu...

Page 29: ...Default Au B Boiler 2 Selects whether or not boiler 2 is operational CP1 copies the settings of Boiler 1 to Boiler 2 CP1 Au Auto OFF Default CP1 B Boiler 3 Selects whether or not boiler 3 is operation...

Page 30: ...iler and when the burner actually fires This item is only available when Boiler 1 is set to Au automatic 0 00 to 4 00 minutes 1 sec increment Default 0 10 min B Boiler Mass 1 The thermal mass characte...

Page 31: ...hour This item is only available when Boiler 2 is set to Au automatic or CP1 copy 1 1 to 1999 Default 10 B Maximum Boiler 2 Output The maximum boiler 2 output in 10 000 s of BTU hour This item is onl...

Page 32: ...t to Au automatic or CP1 copy 1 and DHW MODE is set to OFF 0 to 50 Default 0 B Maximum Modulation 3 The maximum percent modu lation of the burner This item is only available when Boiler 3 is set to Au...

Page 33: ...C WWSD Occupied The system s warm weather shut down temperature during the Occupied period This item is only available when the External Input Stand Alone DIP switch is set to Stand Alone 35 to 100 F...

Page 34: ...If Boiler 3 is set to OFF and DHW MODE is set to 3 or 4 the DHW contact is closed and the primary pump stays on If Boiler 3 is set to OFF and DHW MODE is set to 1 or 2 the DHW contact is closed and th...

Page 35: ...it The control will not operate the boiler s until the sensor is repaired Locate and repair the problem as described in the Data Brochure D 070 To clear the error message from the control after the se...

Page 36: ...HEALTH OR SAFETY LEGISLATION THE TERM OF ANY OTHER WARRANTY NOT HEREBY CONTRACTUALLY EXCLUDED IS LIMITED SUCH THAT IT SHALL NOT EXTEND BEYOND TWENTY FOUR 24 MONTHS FROM THE PRODUCTION DATE TO THE EXT...

Reviews: